Dealer Industrial Natural Gas steam boiler Armenia

Commissioning of Boiler gas boiler commissioning must be carried out after the hydrostatic test. Before commissioning, should be a comprehensive inspection of each furnace parts, electronic control devices, wiring, etc. are normal, water supply, oil furnace if opened, electrical contacts are in the set position. 1, depending on the size of the fuel consumption, the initial damper, the hydraulic pressure. 2, the power is turned on, the power switch to open the cabinet, the water pump starts furnace, (if the pump is rotated into the anhydrous, pump purge valve is opened, the air exhaust pump). 3, control checks whether the normal water level electrode. 4, check the burner operation is normal. Starter burner starts combustion when the water level rose to a predetermined level, the start of combustion is normal to observe: Start no vibration noise, stable combustion, no smoke, orange yellow flame, burning bright clear. Otherwise, to make the appropriate adjustment (refer to burner instructions). Note: The oil pressure between 0.8 ~ 1.0Mpa, after a good tune, do not easily change, oil pressure is too high or too low have an effect on burner performance life. 5, check the pressure gauge pointer swing is smooth, with or without loosening stuck. 6, whether the discharge check valve is set at the set pressure steam: Pressure controller first maximum working pressure, a safety valve is adjusted to the set pressure higher than 0.05MPa, when the furnace pressure was raised to whether the exhaust pressure setting, if exhaust , pulling the safety valve a few times, and try again, if not enough to deal with safety valve to adjust. Pressure relief valve setting: boiler rated pressure + 0.03MPa. 7, check the electrical contacts of the operation: When the pressure is raised to the maximum working pressure (not exceed the rated working pressure), should stop burning, open the safety valve blowing off steam, the pressure to a minimum operating pressure (maximum operating pressure is generally lowest set to 0.10MPa), combustion burner should be restarted. Note: When the adjustment screw should slow, especially when the pointer approaches the end, otherwise, damage the screw off the wire.

Gas boiler installation and preparation requirements of (a) the preparatory work before the installation of a boiler installation must be installed by the unit has installed a license .. The installer must be familiar with "Boiler Safety Technology Supervision", and carefully read the installation instructions and other random technical documents. 2, a mounting position: 1) as close as possible to install a boiler steam, hot site, to facilitate shortening the hot water and steam pipes, reducing capital costs, reducing the pipeline heat loss. The installation site should be water supply, sewage convenience. Burning light diesel oil, heavy oil residue and the boiler must be closer to the oil reservoir; burning natural gas, town gas boiler must be easy to close the gas source. 2) boiler room layout should follow the "Boiler Safety Technology Supervision" relevant provisions "boiler room", to be well-lit, well-ventilated, no ground water, ease of operation and maintenance, boiler room must be equipped with at least two fire extinguishers 1211. 3) Check the boiler foundation, prepare the boiler in place. 3, equipment acceptance: acceptance by conduct an inventory purchase contract or supply list. 4, lifting large boiler: not less than 1.1 times the lifting equipment of large weight of the boiler, two lugs for the lifting jack top or at the bottom edge away slowly, not to any other parts of the lifting or addendum to avoid damage to the boiler. (Ii) installation requirements: 1, the main steam line installation requires the main steam lead pipe height is generally greater than 0.5 m, the bending radius should be greater than or equal to 5 times the diameter of the pipe, the pipe should be installed at the lowest trap, preventing water pipe, It should be a main steam pipe insulation. 2, a main return pipe installation requirements should the main return pipe elbow minimize installation, to facilitate the mounting operation of the valve, piping should be insulated. 3, the hydrostatic testing relief valve, the safety valve should be installed in the exhaust pipe, the exhaust pipe connected to the straight pipe outdoor safety. 4, should be connected to a sewage outfall tank or other security, the pipe should be secured to prevent shifting or counter scald accidents blowdown. 5, railings, stairs (with large oven) after the positioning by drawing the boiler installation. 6, water table must be installed to the lighting device, easy to install or inspection.

Wns gas oil fired boiler

The tech advantage of WNS gas fired steam boiler

Around at 10:12 on February 28, 2019, Zhangjiakou City Chabei Management District Kai Austrian Energy Management Services Ltd. Taiwan 15 tons of steam biomass boiler drum due to the control zone tearing a serious accident, killing three people the death of four people were injured.

Currently seven injured in hospital emergency treatment, cause of the accident is still under investigation, rehabilitation disposal is also an orderly manner.

Heartbreak is that similar incidents happened from the last time, only 28 days.

At 15:30 on January 2019 May 2009 55 points, Zhangjiakou City Hall Ltd. Hong Mei generating boiler scalding accident, three people were killed and one injured.

Boiler special equipment is clearly defined our country, whether it is manufacturing, purchase, installation, operation or maintenance, have strict operating guidelines. Now many have adopted new boiler intelligent control, operational safety compared to conventional boilers, more convenient; but that does not mean foolproof, vigilant and master the correct method of application, in order to minimize accidents frequency. After all, the cost of each accident are living lives.

Recalling these events boiler explosion

March 3, 2014, Xingtai City, Hebei Province, a steam boiler explosion. Boiler plant razed to the ground, surrounded by multi-family residential buildings, factories affected by the explosion were destroyed. According to the injured introduction, cause of the accident may be due to faulty boiler and pressure control instruments not work, the pressure continues to rise, leading to an explosion.

November 15, 2014, Wangcun Daiyue located in Tai'an City, congee shop offices under Daiyue Xiaoxiang Court Food Co. boiler explosion accident caused part of the building collapsed, the scene four different degrees of harm employees .

About 5 minutes, packaging wood factory near Jincheng territory of Huai'an City, Jiangsu Province, south of the village of Hope Town boiler explosion occurred at 9:00 on January 24, 2016.

February 28, 2016, after the city of Hebi in Henan Province Junxian Pi Mao Shan Street office building energy source of the village cents Ltd. boiler explosion occurred, resulting in many injuries and death.

May 12, 2016, hurt Fengxian Plastics Corporation boiler explosion occurred, resulting in many casualties.