6t Agent Price Industrial boiler Thailand

Installation of hot water 6t agent price industrial boiler thailands and heat production and hot water radiator description: The hot water boiler in the boiler, I believe we are not unfamiliar, because the front of the site has been conducting presentation description of this product, good for people to know and understand it, so use the correct in practice, to avoid making mistakes. Therefore, in order to achieve the above purpose, and to accelerate their learning process, the following will explain the knowledge to continue work in this area, I hope everyone from some of the harvest. 1. central heating, hot water boiler heat production should be how to calculate? Central heating, if you do not know anything, then it is impossible to carry out calculations of hot water boiler heat production. Therefore, it is necessary to know the specific value of temperature, pressure and flow rate of the three parameters of the boiler, and then use a formula to calculate its heat production, which is specific formula, is as follows: hot water boiler producing water heat = specific heat flow * * * time for the return water temperature 2. hot water boiler, which is how much hot water per hour?

Matters needing attention and standard flow of 6t agent price industrial boiler thailand periodic sewage discharge operationOperational notes and standardized procedures for boiler periodic discharge: 1. Periodic Sewerage notices 1. The main value of the furnace should be contacted before the discharge is discharged, and the steam turbine can be approved before it can be carried out. 2. When discharging water level is normal, after discharge, check whether each sewage door is closed tight. 3. Sewerage doors should not be opened to more than 30s, can not open two or more sewage doors at the same time, in order to prevent damage to the water cycle. 4. Open the drain door slowly in case of water shock. In case of water shock, close the valve until the shock disappears, and then slowly open the drain door. 5. When operating the valve, you should stand on the side of the valve, strictly prohibited Right to the valve. II. Discharge operation flow 1. After receiving the scheduling task, labor protection supplies dressed neatly, with a special F wrench, on the spot open the general gate. 2. Open all the doors, contact the DCS screen of the furnace to open the corresponding discharge electric door, after the discharge, first close the second door, then close the door, one by one, one by one. All sewerage is over, close once door of each discharge and main gate of sewerage 3. When discharging water, we should pay close attention to the water level. If there is any abnormal water level or accident, the discharge should be stopped. For 2 hours, the door cores of each discharge door shall be checked for leakage, and if the drain is lost, the drain door shall be opened promptly once. Note by removing residue that may be stuck in the core of the door (boiler principal value should be contacted before operation): the whole drainage process should be in close contact with the DCS operator.

Analysis of Zhengzhou industrial 6t agent price industrial boiler thailand scaling analysis of the real situation of large-scale power plant boiler has a full range of water treatment equipment Zhengzhou industrial boiler scaling the real situation, strict rules, comprehensive and complete laboratory projects and means, generally does not occur Boiler scale phenomenon. Boiler fouling generally occurs in the small industrial boilers, it focuses on scaling the case of industrial boilers, industrial boiler fouling situation has the following characteristics: first, the case of large enterprise scale boiler good small and micro enterprises. More formal management of large enterprises, while the initial investment usually have to buy a full range of water treatment equipment, water treatment procedures are relatively robust and effective implementation, operation and maintenance is relatively routine in place, a high level of knowledge of personnel, personnel to follow procedures operating. Boilers generally not fouling, or some boiler scaling a smaller area of ​​thickness or less, because in the past some units do not attach importance to water treatment, causing boiler fouling, and later after changing ideas, to take measures to strengthen the water treatment operation, the scale can well controlled. And general small and micro enterprises, the concept behind weak management, lack of knowledge, poor management, lax supervision and management of the operator, the operator or lack of knowledge can not strictly enforce the rules, poor sense of responsibility, boiler with drugs or salt supply is not in place, not timely, boiler fouling situation is more common, some scale thickness and area of ​​more than TSGG5003-2008 "boiler chemical cleaning rules" requirement, must be carried out chemical cleaning, and even some of the bottom of the boiler vertical boiler shell filled scale, hand hole can not be opened. Second, some units use surface water such as lakes or reservoirs, due to the large surface water turbidity, hardness is small, in the water treatment measures are not quite perfect, small scale inside the boiler or only some debris, dirt, scale relatively good deal, this case has little effect on boiler operation. And some use of groundwater units, because the larger individual areas of underground water hardness, water treatment measures in place, the boiler heating surface heap knot hard scale, a great impact on the hard dirt boiler thermal conductivity. So different sources of water supply boiler, the boiler can also cause fouling situation is different.

In mid-April, Hohhot, Inner Mongolia issued a notice (hereinafter referred to as the "Program"), "Hohhot tackling air pollution control plan" (2018-2020), the "plan" to win tough fight pollution prevention, to promote air pollution control, as the city to create a pleasant living environment for the development of the measures.

For air pollution control, "plan" set goals. As of 2020, Hohhot air quality more than two days ratio reached 83.8%, fine particles (of PM2.5) concentration of 35 micrograms / cubic meter. Wherein, 2018 Hohhot air quality objectives: good percentage of days to reach 79.5%, fine particles (of PM2.5) concentration of 39.2 micrograms / cubic meter.

Since 2017 to enter the heating season, Hohhot is the air quality continues to improve, has introduced the autumn and winter air pollution in Hohhot comprehensive reform program "," Hohhot 2017--2018 autumn and winter special inspection of comprehensive air pollution control program of work of law enforcement. " "Hohhot 2017--2018 autumn and winter air pollution in the comprehensive management of supervision and inspection plan", "Hohhot environmental Protection Agency checks on the issuance of the work program of the winter heating enterprises notification", "Hohhot City people's government on the issuance of residential heating clean alternative , "and other series of notifications. Key measures to coal-fired boilers for heating and bulk coal governance.

Second, the city's coal-fired boiler coal yard, residue field to achieve full closure transformation; more than 20 tons of steam / h coal-fired boilers have been installed pollution-line monitoring equipment, and networking with the Municipal Environmental Protection Bureau, established a 24-hour monitoring system.

Through the above measures, Hohhot air quality improved significantly compared to the same period. January 1, 2018 --3 17, good days Hohhot total 66 days, an increase of 4 days last year. Sulfur dioxide concentrations decreased 40.7% over last year, PM2.5 concentration decreased by 20% over the same period last year.

According to (2018-2020) spiritual requirements "Hohhot tackling air pollution control plan", 2018, the Board will eliminate 35 tons of steam utility / h coal-fired boiler room 11 - 15, involves heating an area of ​​3.872 million square meters. Currently the demolition and integration of clean energy and the transformation is complete, out of the task have been put in place, we have been completed out of eight coal-fired boilers and boiler room of the grid work, removal of nine coal-fired boilers (grid yet dismantled three, to electricity yet dismantled three), and has been able to "break two three clear", the remaining boilers will be completed by the end eliminated.