hostel natural gas steam atmospheric pressure fire tube boiler for sale

The oil and gas water tube hostel steam atmospheric pressure fire tube boiler for sale produced by ZBG is a fast-assembling boiler that can be used in bread factories to steam supply, hot water supply, heating and other uses. Moreover, the boiler has a small footprint, which reduces the investment in the boiler house, and the boiler is highly automated and reduces labor costs.

Dongguan City, Guangdong Province in phasing out coal-fired hostel steam atmospheric pressure fire tube boiler for sales to replace the environmental transformation, biomass boilers in industries packaging, leather, clothing, textile and other widely used. However, biomass boilers still present drawbacks: If insufficient biomass combustion, typically generate a lot of dust, nitrogen oxides and other pollutants, improving PM2.5 concentration, air quality.

Dongguan City Atmospheric Office official said that since the Dongguan started Blue Sky Battle since, the city ton output capacity the courage to decisively eliminate those high pollution and high emissions industries and enterprises, won the majority of the masses of people, as well as many businesses family support; many enterprises to actively upgrade and elimination of outdated equipment and production capacity. In the eco-friendly background, out of high pollution equipment is the trend.

Transformation and upgrading of enterprises demand, government support policies have, inside and outside the echo, Dongguan out of biomass boilers into the fast lane. As of January 10, a biomass boiler out of the task of the city within 31 town street in Shilong, South City, the nave, Ma Yong, Hou Jie, stream, Feng Gang, Xie Gang, Chang Ping, Shek Pai, Chashan 11 Towns in the completion of the task of eliminating all living matter within the jurisdiction of the boiler. In addition, Long, Qi Shi, Tangxia, Sha Tin Kau five towns out of the completion of more than 90%, the remaining 15 Towns also have the confidence out of the task in the year 2019.

While out of the biomass boiler, Dongguan City, accelerate the pace of construction of gas pipeline to provide clean energy for the needs of the enterprise.

Atmospheric Office official admits:. "A few years ago, the city lags behind the construction of the gas pipeline, laying of pipe network coverage area of ​​a small number of enterprises in the coal phase-out of high-polluting fuels, the use of biomass boilers as an interim energy supply equipment, there are also often allowed to change the fuel business, steal burning coal. "but now, due to the environmental protection departments to actively coordinate the town street, village (community), industrial areas, and vigorously promote the construction of natural gas pipeline, starting from the source to provide clean energy for businesses, stealing burn the behavior of coal is greatly reduced.

Over the past year, the city has a new natural gas pipeline 256.6 kilometers, 530 companies have security using natural gas. The city urban management department based on the actual distribution of useful gas needs of enterprises to develop business for the city's more than 600 natural gas pipeline construction plan and coordinate the new Austrian, Xinghua, often positive and three gas pipeline company to carry out construction work to ensure that the natural gas pipeline construction project smoothly, so that more companies access to clean energy as soon as possible.

According to statistics, date, Dongguan City gas pipeline or central heating station accessible area of ​​660 biomass boilers, has eliminated 572 units, 41 enterprises have to apply for the boiler out of subsidies.

Pressure hostel steam atmospheric pressure fire tube boiler for sales Products of the non-pressure hot water boiler, also called pressure boilers, boiler usually refers to the top does not bear the water column static pressure of the heating system. That is quite an open hot water tank. Meaning pressure boiler: boiler body opening to the atmosphere. In any conditions, the boiler at the water line are zero gauge pressure boiler. Pressure boilers Model consists of three parts, connected by a hyphen between the parts. Categories: pressure hot water boiler is mainly classified by fuel can be divided into CLDR (CWDR) often piezoelectric hot water boiler, CLHS-YQ (CWNS-YQ) pressure fuel (gas) hot water boilers, pressure coal-fired hot water boilers. Model: The first part of the model by atmospheric pressure boiler code, pot-type code, combustion equipment code, the rated thermal power four sections. Boiler pressure is represented by C code example: CLSG0.35; 95/70; W12 represents a vertical pipe fixed grate boiler pressure, the rated thermal power of 0.35 mW, rated outlet water temperature was 95 deg.] C, the nominal temperature of the water inlet. 70 ℃, burning anthracite class I, a second design of the boiler. Product Structure: The overall structure of pressure boilers and boiler auxiliary equipment including two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Also known as the furnace combustion chamber, fuel combustion for space. The solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as fire bed furnace; solid fuel furnace liquid, gas or pulverized, is injected into the combustion chamber is called the fire chamber burner, also known as the furnace fire chamber; air coal particles burn hold it was boiling, and the furnace is inferior fuel suitable for combustion is called fluidized bed furnace, also called fluidized bed furnace; coal particles so that an air flow rotated at high speed, and strongly called fire cylindrical cyclone furnace hearth. Furnace design needs to fully consider the characteristics of the fuel used. Each boiler should be fueled with the original design of the fuel. Boilers running economy and reliability are likely to vary greatly reduced when using the characteristics of fuel combustion. And the natural circulation drum is repeatedly forced circulation boiler receiving feedwater to the economizer, the coupling cycle and supplying saturated steam superheater cylindrical vessel. Simplified drum made from high quality steel plate, is one of the heaviest components of the boiler. Safety knowledge; boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in government agencies, public companies and all walks of life, are dangerous and special equipment. Event of an accident involving public safety, it will cause huge losses to the state and people's lives and property. For public safety, people's lives and property safety, according to the State Council, "Regulations on Safety Supervision of Special Equipment", the boiler should use full attention the following matters: 1, should be accompanied by safety technical specifications of the factory boiler design documents, product quality certification, safety and the use and maintenance instructions, supervision and inspection certificate (safety supervision, inspection and performance certificate). 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler. Daily operation and maintenance: ⒈ chemical contact, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot water temperature should not be to the drum wall metal temperature difference greater than 40 ℃ .⒉ new installation or after recording before overhaul boiler Feed expansion departments indicated .⒊ Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 ℃ how reheater be preserved? ⒈ turbine after playing brakes, boilers ensure a blower, an induced draft fan is running the best cross reserved two oil gun .⒉ open reheaters to the empty exhaust steam reheater hydrophobic doors and air doors corrosion, anti-corrosion of the reheater steam temperature is lower than a predetermined deg.] C for 400 .⒊ control drum water level within the permissible range .⒋ preservation time less than 20 minutes after stopping two oil gun operation guaranteed .⒌ when the furnace pressure 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.

How many calories Horizontal one ton steam hostel steam atmospheric pressure fire tube boiler for sale needs? 1 ton steam boiler, require 600,000 calories, biomass is the most economical fuel. 1 t of steam boilers, 600,000 calories needed, is converted into fuels: diesel 58kg / hour, i.e. cost of diesel and 466 / hour; biomass particles 150kg / hour, the cost of 165 / hour. 697 electrical degrees / hour, i.e. cost of electricity 697 / hour; gas 75m3 / hour, i.e. cost of natural gas 375 / hour; 120kg of coal / hour, i.e. cost of coal is about $ 120. As can be seen from the above, coal and biomass particles are the most economical. Wherein the combustion of coal is difficult to control, and the actual consumption costs considerably biomass particles. However, polluting coal boiler is very large, and the biomass boiler is both economical, and environmentally friendly. Accordingly, we can see that biomass pellet boiler is the best future direction of development of the industry boiler, the boiler will also become the industry mainstream.