the capacity is 10tons szs gas hot water boiler install in bahrain

Water wall boiler tube leak or burst phenomenon how to do 1, the normal water flow is not greater than the steam flow. 2, the furnace pressure transient and unstable prejudiced. 3, tube leak detection alarm device. 4, the furnace may not tight at the outward discharge gas and water vapor, and a significant leakage sound. 5, the main steam pressure drop. 6, boiler combustion dark flame instability caused by severe boiler fire. 7, when the induced draft fan is automatically cast, abnormal static vane opening is increased, the current increases. 1 reason, the presence of water wall tube material defects or post-production, the installation of the damaged pipe, poor welding quality. 2, the inner tube fouling overtemperature. 3, the inner tube corrosion. 4, water wall wear. 5, the long-term high load operation, furnace coking, coal sulfur corrosion caused by high temperature water wall. 6, improper combustion, flame deflection. 7, in the possession of bad foreign body, the water cycle. 8, the wall of the long-term over-temperature operation. 9, the temperature difference between waterwall tubes, mechanical stress crack. 10, the normal exit or drain sootblower steam punctured tube. 11, smashed chunks of coke furnace water wall tube or serious explosion occurred, resulting in water wall tube suffered external damage. 12, boiler overpressure long run. 13, the boiler starts to heat up, step-up too fast. 1 process, the leakage should try waterwall tubes outage. The leakage is not serious, while still capable of maintaining operation, note that each of the automatic operation when the device, if not normal, it is cut immediately to the manual, if necessary, may be down, down-load operation. Closely monitor the development trend of damaged parts, good accident anticipation, application shutdown as soon as possible. 2, if the leak is serious, the bursting point temperature after a sharp rise in quality work, leading to serious over-temperature wall, unable to maintain the normal operation of the boiler or threaten the safety equipment, emergency shutdown provision should be processed, when the steam temperature to protect the action value, the protection does not move, should immediately hand MFT. 3, note that the operation of the electrostatic precipitator, to strengthen the inspection checks, to prevent fouling, and the electrodes ESP hopper, pipes and the like plugging air preheater ash. 4, after the shutdown, should retain ID fan, the furnace pressure is maintained constant, there is no discharge to be stopped after soda ID fan.

10 tph WNS series gas-fired fire tube boiler for hospitals

The Second Hospital of Jilin University is a third-class & first-grade comprehensive clinical hospital. Hot water and steam are essential energy sources for large comprehensive hospitals, providing adequate steam heat energy support for hospital heating and daily disinfection. Under the background of current energy-saving emission reduction and refined management, the Second Hospital of Jilin University actively responded to the national "coal to gas" policy and decided to replace the old boiler equipment with low efficiency and high emission.

Fuel gas steam boiler safety and the prevention of fuel gas steam boiler is the flagship product, installation and after many years of production experience, now a comprehensive summary of the accident prevention measures gas boiler fuel and steam to share: fireman who must operate by the quality and technology supervision department issued the use of a registered boiler. Fireman who operate independently of the operating permit required to hold a fireman, and you meet the operational requirements of furnaces and categories. Boiler ignition should be done before the body of the boiler, burners and other auxiliary equipment, all attachments, valves, water supply, gas supply system and the electric control circuit inspection departments, and confirm normal. Play an open air valve, water to the pot water level slightly lower than normal water level. With "manual" to start the fan, the furnace was purged, the control system is adjusted to "auto" position, and then press the "start" switch, the boiler will be according to a predetermined program: Purge - Ignition - combustion - temporarily shutdown. Such as a faulty ignition program, fans can continue to manually purge and re-ignition, such as three unsuccessful ignition, to cease firing and gas, to identify the cause of the fault elimination, in order to re-ignite. When the pot was raised slightly greater than atmospheric pressure, the air valve has steam coming, can close the air valve. Requirements fuel gas steam boiler boost process, according to the provisions of checks and do all the operations carried out in order to confirm or steam supply and the normal furnace. After normal operation, you should always adjust the air supply, air supply and water supply, to maintain the water level and pressure stability, the need to adapt to the load, to ensure that the steam supply. Operation inspection checks should be carried out once every hour, and carry out all the provisions of the recording, check to confirm the name. Class should be flushed sewage water table and each time, the exhaust valve test, pressure gauge should be required to flush the requirements of the trap and check the safety devices perform, record and fill in, sign name recognition. First stop during normal shutdown supply, air supply is stopped later, to keep the water level above the normal water level. Fuel gas steam boiler furnace and flue gas boiler explosions are common in accidents.

The United States is our national enterprise, one of the world's top 500, with very bright glory on the world stage. US air-conditioning as a subsidiary branch, with a very large market competitiveness. 2016, Hubei US air-conditioning due to market demand to expand production lines, need to purchase steam boiler to provide energy support for the new production line. After the boiler industry for a number of enterprises contrast, is determined to cooperate with the fast boiler, buy a whole 10 tons of steam condensing gas steam boiler (WNS10-1.25-Y.Q).