20 tph oil and gas burnham boiler series 2 for Paper mill

Paper mills consume a lot of steam because of their production needs. In order to meet the production needs, paper companies need to purchase boilers for steam production. A paper mill in Iran purchased a 20-ton szs series of fuel gas boilers produced by CBM according to production needs.

Environmental protection burnham boiler series 2 use different fuel characteristics of each boiler using environmentally friendly fuel What? Common energy-saving environmental protection boiler fuel natural gas, diesel, electricity and methanol. Natural gas is the most important environmental protection boiler, its fuel natural gas is a clean energy, combustion products discharged after treatment safety. Natural gas boiler maintenance costs of environmental protection is very low compared to the energy efficiency of is very high, such as our thermal efficiency of gas-fired Stone can reach 95%. This boiler is the government's most important eco-friendly boiler. Environmental protection boiler fuel diesel fuel use in general, because of the relatively low price of diesel, sulfur dioxide and other acidic substances produced by burning it after treatment can be safe discharge standards, supporting measures that it needs storage tanks, maintenance costs are lower thermal efficiency up to 90% or even higher. Electric heating boilers are environmentally friendly boiler, wire and cable facilities is required, it is zero pollution, low maintenance costs, but the state has requirements of energy conservation, power cuts in some places the situation may occur, especially in summer the peak period. This is also a need to place special attention. Environmental protection boiler thermal efficiency of methanol selection of energy-efficient boilers, facilities storage tank is required, but also the Government's strong support for environmental protection boiler.

Wuhan Yu Dahua Group Co., Ltd. is a cotton based, weaving, knitting and textile car decoration installation in one of the cross-industry, diversified and comprehensive export-oriented enterprise groups. 2017, the Group expanded production scale textile processing, the number of new production lines, the Group's original steam burnham boiler series 2 can not meet the growing demand of orders in urgent need of a new steam boiler purchase. When selecting vendors steam boiler, the boiler output device side fast sustainable high quality steam attracted, decided to cooperate with the fast boiler. Fast art by side to the user site needs analysis, to provide two integrally condensing gas steam boiler (WNS4-1.25-Y.Q).

How to set the height of the burnham boiler series 2 chimney

The coal fired boiler can be divided into two kinds:vertical boiler and horizontal boiler. And the horizontal boiler is very economic because of its long flue gas flow, slow smoke discharge, high heating efficiency. So it is widely sued in the market. After buying a boiler, it is necessary for them to build a boiler room,in the installation the height of the chimney also need to pay attention. According to the ZG engineer, the chimney height should be accordance with the lowest height of GB13271-2001 stipulation. Only one chimney is allowed in a boiler room. The specific requirements was listed below:

1.When the boiler’s output capacity is more than 1t/h or 0.7MW, a permanent thief hatch and relevant facilities should be setted in compliance with the stipulations of measuring method for smoke and dust of boiler emission, and The determination of particulates and sampling methods of gaseous pollutants emitted from exhaust gas of stationary source.

2. The exit diameter of the chimney should be not lower than the largest load. The smoke flow should not be too fast. when the load of the coal fired boiler is at its lowest level, the velocity of the chimney exit should not lower than 2.5~3m/s.

3. If the chimney heat does not reach the height of the above stipulations, the maximum discharge concentration of the dust,sulfur dioxide, nitric dioxide should be carried out at 50% of the corresponding area and time emissions standard .