gas fired water tube steam boiler manufacturers

Our company in the choice of boiler products, attaches great importance to the quality of emissions and fired water tube steam boiler manufacturerss, boiler low emissions of pollutants party provides fast, good steam quality is superior boiler products. --customer feedback

When the external inspection of the fired water tube steam boiler manufacturers few notes below Henan fast boiler's steam boiler Xiao Bian told you about the external examination of the few notes need to be transported when the steam boiler, it is necessary to check the external steam boiler, 1, security accessories are complete, sensitive, reliable, secure attachment of the installation for compliance with relevant regulatory requirements. 2, can test gauge when necessary, the safety valve exhaust test. 3, auxiliary equipment (fans, pumps) is functioning properly. 4, automatic control equipment, signal systems and a variety of instruments is sensitive and reliable. 5, various types of door is tight, leaks and corrosion. 6, placed in the drum to the combustion chamber wall may be observed, water wall is normal, without deformation or other anomalies. 7, the combustion is stable, whether black smoke chimney. 8, steam boiler furnace wall, architecture, platforms, escalators, etc. is intact: water treatment equipment is operating properly. 9, boiler room facilities for compliance with relevant regulatory requirements, management is normal and so on. 10, the visible parts of the boiler weld cracks cracks (joints) appears. Classification of a steam boiler combustion apparatus, the four-way steam boilers for solid fuel burner layer being layered on the furnace grate stratified charge combustion. Such as: hand-burning stove, chain furnace stoker furnace. Second, the four-way chamber burner fuel mist of fine particles with the air injected into the furnace combustion furnace in suspension. Such as: Pulverized Coal, oil furnace, gas furnace or the like. Three, four boiling furnace fuel stream is lifted carrying like rolling boil under goes a combustion furnace.

How much gas 6 tons per hour of fired water tube steam boiler manufacturerss need? How much natural gas steam boiler needs an hour? 6 tons calorific gas steam boiler 360 million cards, the design pressure of 1.25MPa, the maximum steam temperature 194 degrees, consumption of natural gas per hour at full load boiler 420m3. The above data is only theoretical gas consumption, the actual gas consumption is influenced by many factors. 1, the thermal efficiency of the design; 2, insulation effect; 3, discharge times; 4, fireman professional level; gas and steam boilers are mainstream industrial production equipment. Especially since the implementation of the national coal gas policy, China has not yet biomass boilers and coal-fired boilers appear. Users select the gas-fired most important criteria are reasonably priced, low operating cost, easy to say and difficult choices. What price is only worth buying for key boiler, gas boiler selection is a measure of its quality, how to identify the quality of the boiler? 1, should be sufficient energy, emissions, low emissions; 2, low air consumption; 3, low operating costs; 4, stable; 5, long life; condensing gas boiler advanced design, for flue gas flow reasonable the design optimization. Sufficient heat transfer through the flue gas and smoke tubes economizer, heat the fuel sufficiently. Gas boiler for maximum energy efficiency.

Industrial gas fired water tube steam boiler manufacturers room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.