2 MW hot water boiler fuel gas fire

4 tons of steam boiler before firing what needs to be done to prepare a deal boiler conduct a comprehensive inspection before Sheung Shui, the water is softened before boiler water filling. 2, Sheung Shui should check whether there is water leakage valve, leaks should be immediately removed when found. 3, the check Sheung water temperature, pressure gauges, water level, no good production of inlet and outlet valves, smoke profile, said shutter is flexible, the flue gas channel is smooth duct, each cleaning doors are tight. 4, before firing coal with water 8-10%.

Select the fuel gas-fired boiler when what issues should pay attention to it? With the National Energy Bureau of Statistics figures out show that China's coal reserves are decreasing year by year, has been unable to meet our daily consumption, then the traditional coal-fired boilers will be gradually out of the market, a new type of fuel gas-fired boiler will become the new main force, then we choose the fuel gas-fired boiler when what issues should pay attention to it? Xiao Bian gave you about the advantages of the river south fast fuel gas-fired boiler is reflected in What: Henan party soon, Ltd. manufactures compact gas-fired boiler fuel, boiler and ventilation, water supply, control and auxiliary equipment are provided on a chassis as possible for customers to free up more space. The advantage of this is that while the boiler is compact but its capacity is not small, hot water and heating range is not reduced because of the small volume. Main pressure connection element Henan local fast fuel gas boiler are as follows: 1, the main fire tube boiler pressure parts: the center back to the combustion chamber, boiler shell, a tube sheet, furnace, pipe tobacco, smoke box; 2 main pressure element water tube boilers: drum (drum), the waterwall tubes, boiler bank, serpentine tube header; 3, the main pressure connection element fuel gas boiler: the main welding, also part expansion may be.

2019 Beijing ISH fair as promised, fast Boiler another outstanding performance and overall strength, won the attention of those present. In the booth fast boiler and a variety of low-nitrogen series of new products at the show stunning debut, became very attractive in Hall E2 bursting exhibition. In the booth, businessmen from across the country sitting together, Consultant fast low nitrogen boiler product performance situation, but also other fast proprietary remote monitoring system is full of interest; more admiring friends, in the initial communication after, have leave contact information, and field sales engineer long talk fast square details of cooperation;

Gas Steam Boiler Water Wall Tube Explosion Analysis and Processing With the west-east gas project in-depth and complete, and the "coal to gas," the implementation of Beijing, Urumqi, Daqing and other cities and district heating heat source to promote the use of gas-fired boiler . More commonly used gas-fired boiler type D, type 0, A-type, p-type [1-2], these four basic types of furnaces by dividing the furnace cross-sectional shape. Wherein, D, 0, A-type small capacity boilers belonging horizontal boiler, boiler Ding is a large vertical boiler. The four furnaces are used membrane wall structure, eliminating the flue gas leak, reduce heat loss and improve the thermal efficiency of the boiler, ensure the stability of the structure. A compact, short installation period, high thermal efficiency, low noise, low energy consumption, low emissions, long life (design life 30a), adaptable load fluctuations and other characteristics can be controlled by computer program running faults and Protective function. Domestic slightly less than the amount of evaporation experience in the development of high-power gas steam boiler in the 75t / h or more, most of the development work is based on the introduction of Europe and learn from small gas steam boiler above. China's own design of high-power gas steam boiler in the course of running more than a vibration, burst pipes and other problems. This paper discusses some evaporation of the squib causes and treatment of boiler waterwall 160t / h of a gas steam.