medium pressure oil fired steam boiler for sale

Industrial gas medium pressure fired steam boiler for sale room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

Our company processes in multiple new energy automobile production will need to heat, the boiler equipment we choose is really a headache, fast Boiler solve our urgent needs. The purchase of electric water boiler system is simple, easy to operate, easy to maintain, high thermal efficiency, saving a lot of operating costs for our company. --customer feedback

Buying a set of natural gas fired medium pressure fired steam boiler for sale for beverages plant, 3 ton steam capacity, 5,000$ is enough. In our ZG Boiler, all gas oil fired steam boiler thermal efficiency can reach to 92%, higher than those solid fuel boilers. With rich experience on consumer reception, most beverages plants prefer gas oil fired steam boiler. Now, considering with fuel costs and steam requirements, our client is pleasure to order a set of WNS series 3 ton natural gas fired steam boiler for beverages plant. 1 ton steam boiler consume nearly 74m³gas fuel per hour. Thus, 250m³natural gas fuel can ensure this 3 ton steam boiler work in one hour.

Oil-fired boiler maintenance methods "" A lot of companies because after the purchase of oil-fired boilers, Careless maintenance process, with the result that the useful life of oil-fired boiler is greatly reduced. So how should it be maintenance of the oil-fired boiler? The following article gives you a detailed analysis. After conducting oil furnace shut until the furnace cooled water to the boiler water below 70 ℃ exhausted, the internal completely remove the dirt, washed away, all manholes, hand holes, valves and other pipeline tight blockade, and with a blind plate and running boiler completely isolated. After all of the alkaline solution is added, and then injected into the soft water boiler, until the water coming out from the highest point till the boiler, the water supply valve is closed, note that the average mixing an alkaline solution inside the boiler. Stop oil-fired boiler more than a month, maintenance of law should be dry, wet maintenance shutdown method can be used the following month. To schedule the maintenance period Microflame oven, schedule the water cycle, the concentration of the alkaline solution throughout the same. Every five tests also take a basic solution, such as alkalinity less than 5-12mmol / 1 solution should be applied. Periodic inspection outage before the oil-fired boiler furnace, should be prepared to work the following three aspects: (1) review the registration technical dossier furnace boiler and boiler furnace usage understand. In order to fuel the transformation within the furnace boiler external inspection be aware, the general need to understand: the transformation of the electric furnace boiler design, manufacture, installation; boiler furnace revamping; boiler furnace use history and usage; boiler furnace water treatment case ; boiler performance and other rules and regulations. (2) Check before shutdown preparation. First, with the production schedule maintenance shutdown date, and then let the transformation of the normal furnace boiler shutdown program shutdown, but slowly disheartened. Injecting cooling method may be employed downcast water, replacing the water cooled furnace and the furnace into line ventilation cooling. When the boiler water temperature was reduced to 70 ~ 80 ℃, before drainage. Open all doors hole. When the door opened, to prevent warm water, steam jet man suddenly burns. Corresponding to the passage blocked pipe on the transformation test furnace boiler steam, water supply, sewage and other pipes and other run in the transformation of the electric furnace boiler. Blocked with shutter have sufficient strength to avoid being broken drum high pressure medium. To clear the blocking position is indicated. And other operational boiler furnace flue should be communicated reliably cut off. Also to clear the transformation of furnace soot and scale boiler by warm surface. (3) test preparation tools and lighting. In order to ensure the smooth entry inspection, the inspector should prepare the necessary equipment, tools, measuring tools and safe and reliable lighting devices.