steam boiler the fuel coke oven gas BFG the pressure 90 KSC the capacity 45 TPH

About the advantages of gas-steam oven gas is mainly reflected in what way in recent years, with the continuous development of the boiler industry, a variety of devices including gas, including gas-steam oven has been further developed and applied. We know that the production of each device can be widely used. It has its own advantages, the main advantage of what gas furnace gas and steam are we talking about today? According to reports, the gas can understand that gas-steam oven does not require the accumulation of ash, thus eliminating area. When the gas for a fuel delivery gas steam oven, other auxiliary machines less, low-power, continuous operation time is short, and therefore at a high level, saving electricity. Production of heat transfer oil boiler. Others because the gas furnace gas and steam will now run out of dust and pollution, natural gas is used as a clean energy source. In the Gas Gas steam oven operation, no pollution, and it is easy to achieve. Nightly environmental needs. Daily use of gas gas steam oven needs maintenance. When not in use the boiler, should carry out maintenance and maintenance. This will not only extend life, but also can reduce the use of various problems arising in the process. First of all, when not in use boiler, heat transfer oil to be discharged of all internal, because if there is oil, the quality will change. If a leak occurs, it will affect the surrounding environment, and needs to be cleaned after release. Clean the inside of the boiler to maintain and keep other impurities. Secondly, regularly check the various components of the gas oil furnace to see if there are loose. After maintenance, the boiler can be stored, can be used directly in the next use, not other problems. Xiao Bian remind you, after using a gas furnace gas and steam for some time, the loss will occur. If the loss is too large, it will affect their use, particularly in certain connections and transmission loss larger. Add lubricant to reduce the loss of these components and more stable performance of the boiler.

Large oil hot water boiler burner a noise factor, the shut-off valve closed pipeline road. 2, the filtration system Yong plug. 3, pump causing the problem. 4, the main blower fan bearing damage. 5, the fan blades James Gray. Hot water boiler fuel gas-fired boiler constitutes Profile | fuel boilers | steam boiler the fuel coke oven bfg the pressure 90 ksc the capacity 45 tph Environmental Equipment Co., Ltd. both production and life, oil hot water boiler is that we often use to get, then this time I gave you comb their fuel heat major components related to water boiler. A blast device: blast An air outlet device provided with a filter, after extraction air into the motor during operation of the burner, to adjust the size of the fire. Second, the water pump: yes into the main condenser pumped back from the water softener, thereby absorbing the thermal efficiency of the fuel to form a hot water boiler exhaust a water preheating effect. Third, natural gas systems: the interface comprises a gas, burner, gas conditioning system. Fourth, the security valve: install a certain pressure value exceeds the pre-set own relief. Fifth, oil hot water boilers electronic control system and additional summary said earlier, these would certainly constitute a hot water boiler fuel, on the way if manufacturing capacity, poor water quality rules for the operation of boiler, the boiler is not possible to start from, need lots attention. On the way manufacturing capacity, fuel hot water boiler for regular maintenance, maintenance time for serious notes, only very careful operation, persistent maintenance, before a deeper level increased efficiency, only adverse consequences may occur.

ZG production of DHL package steam boiler the fuel coke oven bfg the pressure 90 ksc the capacity 45 tph is committed to energy conservation and environmental protection, is widely used. It is through the efficient combustion of some biomass fuels, rice husk, sawdust, agricultural waste, to ensure the efficient, clean, safe and stable operation of the boiler. The series of boilers using a new furnace structure, to avoid the direct heating caused by the bottom of the raised, also designed a two-wing gas pipeline structure, to avoid the flue crack.

In response to the state-assigned air quality improvement objectives and environmental supervision central feedback coal-fired boilers environmental pollution rectification program, Kang County, Gansu Province based on "government-led, relying on real responsibility, Take Measures to proceed with" principle, accelerate the burning of remediation work out of the coal boiler, and to develop the following measures, at present, reconstruction activities are being actively promoted.

A: a comprehensive investigation, the establishment of accounting. For urban areas, towns, Kudo industrial parks all coal-fired boilers to conduct a comprehensive diagnostic investigation, a total of investigation and the use of the boiler 31 enterprises, a total of 38 boilers, electric boilers and removal of fuel two boilers, coal-fired boilers county a total of 36, including two sets of 20 tons of steam boilers, coal-fired boiler pressure 4. In the diagnostic process, the situation boiler location, type, number of units, the tonnage, use, carefully verify the age and so on, and sort out the summary, so that a boiler does not leak, the device information is not a shortage.

Two: to strengthen publicity, and create atmosphere. Through new media, focus on advocacy, government circulars issued, will be held to promote the government leaders in charge of on-site investigation led mobilization and other forms of media offensive formation, multi-level multi-angle carry out various forms of publicity and education remediation phase out coal-fired boilers, each guide society personnel support and participate actively promote the use of coal-fired boiler units understand the situation, to speed up the phase-out of coal-fired boiler renovation.

Three: supervision of interviews, results-oriented. Person in charge of the county Bureau of Quality Supervision led, in-depth coal-fired boiler unit, for the slowness, lack of knowledge, waiting to see the business units and enlighten them with reason, and emotionally moving. With the responsible persons of the two job interviews lag to not be one of them out of the situation Reconstruction of boiler in accordance with national policy requirements, on-site recovery boiler registration certificate and ordered deadline to be removed or modified.

Kang mentioned standard by the transformation, step out, closed down closed down, to gas and electricity from coal to supervise a number of measures to actively promote the elimination of remediation coal-fired boilers. Currently the county out of 29 coal-fired boiler units, of which 15 units destructive demolition, stop burning close 12 stations, two mentioned standard transformation. The remaining seven out of focus on remediation plan included in this year, the county continues to promote this work, and to call on the unit enthusiastic, standards do not fall, the team leave, determined to complete the end of October this year, the county and below 10 tons of steam coal-fired boiler work all clear.