Fully Automatic Commercial 8t Natural Gas boiler Thailand

Gas-fired steam fully automatic commercial 8t boiler thailand abnormal situation, how should we deal with it? When we use gas steam boiler, failure or abnormal phenomena it is inevitable, but in order not to affect the normal use, in the event of a problem gas steam boiler to be timely processing solutions, then the face of all kinds of circumstances, we should how to handle it? Share some of the ways we deal with unusual circumstances. If only gas steam boiler circulating pump abnormalities, such as its current decreases, the pump outlet pressure back to zero, which indicates no oil pump is idle, it may be caused by oil vaporization. Yang identify the reasons therefore first vaporized measures; such as clogging of the filter circulating pump bypass opening evacuated immediately clean the filter; heat transfer fluid as a result of added aqueous or decomposed gases are not excluded in the system, should immediately open the vent an exhaust valve. Circulation pump pressure constant, the current increases and the flow drops, deterioration of the thermally conductive fluid, the viscosity increased, should be replaced or regenerated. New heat transfer fluid as a result of decomposition of aqueous or excluded gases in the system, should immediately open the vent valve of the exhaust gas. When the current is lower than normal circulation pump, the circulation pump efficiency is decreased, the flow rate decline may be heating pipes plug fouling, stainless steel chain should be cleaned. If the gas steam boiler before and after the filter increased in pressure, the pump inlet pressure drops, the filter may be stuck, the opening of the bypass, disassemble and clean the filter. In addition to its low furnace outlet temperature liquid phase heat carrier, mainly for lack of heat fouling problems, it is timely soot blowing. Gas steam boiler grate more common problem is stuck, there are reasons including breaking grate or the grate off loose pins; coal grate has stuck to metallic inclusions; arched grate; slag is sinking the tip of the grate stuck. In response to this phenomenon, the required reverse hand grate plate debris removal, replacement breaking grate after the start, then jammed as startup, stop the rotation of the reasons detailed inspection to resolve. But also to re-adjust the adjustment screw on both sides of the grate tension, if still does not work, we need to replace the sprocket.

Selection and classification of fuel gas thermal control system fuel gas fully automatic commercial 8t boiler thailand 1. The boiler classification thermal control system (1) electric system for an electric meter instrument cluster system consists of relays, time relays, the relay program composed of program control and interlock system; manufactured by electronic control and intelligent series or digital instruments, measuring instruments display, sound and light alarm monitoring instrumentation and control system and other components. Electric instrumentation system design experience mature, the price is cheap, but it is difficult to achieve system redundancy, remote data transmission, maintenance is more difficult, more difficult to implement advanced control methods. Electric meter system is mainly used for small boilers, but the electronic control Applications for closed-loop regulation of decreasing almost been replaced by intelligent multi-function instrument, the following sections mentioned electronic control just want to take advantage of familiar industry and the series combination of a widely used instrument that time to explain the principles of the control system configuration and (2) programmable control system programmable control system is the core of programmable logic controller (PLC). Programmable logic controllers are widely used in the initial control, since the 1990s has increased the ability of process control, the programmable logic controller in the field of process control applications more widely.

After completion of the gas fully automatic commercial 8t boiler thailand cleaning, be sure to use hot air to dry them, but not both for heating the furnace walls and other accessories, this is likely to have adverse consequences. Right way is to place an electric heater in the bottom of the gas boiler, heated.

In response to the call of the State Environmental Protection Department, to further improve air quality, enhance people's happiness blue sky, located in Leshan City, Sichuan Province of the energy restructuring and clean coal-fired fully automatic commercial 8t boiler thailand as the primary task of air pollution control, to promote the elimination of coal-fired boilers remediation work. According to statistics, from January to October this year, Leshan City, the main urban air quality index improved 11.86 percent year on year, a figure that ranked third in the province; a few good days of 251 days, an increase of 29 days, compliance rate of 82.57%; PM2.5 average concentration of 44.5 micrograms / cubic meter, an improvement of 14.09%; PM10 average concentration of 69.0 micrograms / cubic meter, an improvement of 5.74%. Improve these figures can not be separated Leshan Municipal People's Government's strong support and initiatives. Leshan municipal government adhere to precise planning, but also a public green, clean living environment.

A careful planning. Since 2017, vigorously promote energy restructuring and transformation of coal-fired boilers, in-depth investigation status of the city's coal-fired boilers, having accurate number of the city's coal-fired boilers, steam tonnage and treatment facilities, the establishment of coal-fired boilers ledger. To promote the implementation of the "coal to electricity", "coal to gas" projects the city's key industries, coal-fired boilers to transform, adjust the expansion of high-pollution fuel combustion zone ban.

Second, the fine classification. Classification of coal-fired boilers to carry out renovation work, from the source strict control of new coal-fired boiler, new and expansion projects to encourage the use of electricity, natural gas and other clean energy; with the implementation of small coal-fired boilers eliminated, medium and large transformation. The city 10 steam tons / hour or less and a total of 717 small coal-fired boiler units are all clear, a total of 1030 tons of steam. Medium-sized coal-fired boiler clean energy transformation or transformation in accordance with the deadline for ultra-low emission "should gas is gas, should the electric power" principle, Taiwan is currently the city's 44 large and medium sized coal-fired boiler clean energy transformation has been completed and ultra-low emissions transformation.

Third, the precise advance. Strengthening full control of behind schedule inspectors to speed up reform. Strengthen financial subsidies, to boost the progress of work, more than 7 million arrange special funds for the transformation of the atmosphere and medium-sized coal-fired boiler subsidy, cities, counties (cities, districts) to finance 20 steam tons / hour and clean energy alternative to coal-fired boilers the implementation of special subsidies.