4t Natural Gas fired boiler Commercial Automatic Cambodia

Oil and gas 4t fired boiler commercial automatic cambodias in overseas markets

Biomass boilers are very popular in overseas markets due to their energy saving and environmental protection characteristics, but oil and gas boilers are selling well in overseas markets due to their ease of use, high efficiency, and environmental protection.

Calculated gas steam 4t fired boiler commercial automatic cambodia plant to explain your boiler heating area: Gas-fired steam boiler plant to you to explain the calculation method of gas steam boiler heating area of ​​the boiler, which is sure to install emissions-line monitoring devices, and, should environmental protection department of the monitoring center networking, so the job. And this kind of boiler heating area, specifically, then, is to be determined according to the location of the boiler, its usage and requirements. Generally speaking, if it is 1 ton, then, it is about 7000 square meters of heating area. 4 tons of gas steam boiler, which uses induced draft fan, then, that in the selection and configuration, generally speaking, if a different motor, then, there is a different choice, but specifically, then, is there are two First, Y5-47-6C, power is 15KW / 18.5kw, grade 2 is a motor; Second Y6-41-7.1C, power is 15kw / 18.5kw, the motor is four. 10 tons of gas steam boiler, between it and the workshop is to have a safe distance, and can not be a piece design, it must be independent. Therefore, it is generally to be more than 5 meters, so the job, however, can also be separated coal field.

Gas-fired steam 4t fired boiler commercial automatic cambodia safe operation Tidbits gas steam boiler safe operation Tips 1. The operator should be familiar with the structure and principles of the furnace and the production of basic requirements for thermal equipment, and constantly sum up experience in practice, control coal thickness, so that the full combustion reduce chimney smoke, protect the equipment in a safe, efficient operation. 2. The new oil furnace or restart long home, gas steam shall dehydration stage heating requirements. 3. export oil temperature should be set below 280 ℃, when the oil temperature exceeds 200 ℃, should pay more attention to temperature, oil temperature should slow down, only non-oil change and over-temperature operation. 4. close contact with production, timely and slow down the oil temperature, while meeting production requirements, taking oil lower, will help extend the life of gas and steam energy savings. The normal oil level: the lower tank oil level is low, high-high oil groove. This ensures that the emergency shutdown when cold oil replacement system and prevents air from entering the pipe. When the high slot in a low oil level should start to replenish gas steam injection pump. 6. The circulation pump is allowed outage in the operation of the burner, when the pump is failure or power outage, Fan stop, depending on oil temperature and take appropriate emergency measures: rapid opening valve 7, the cold head tank oil up through the furnace coils to the low tank. 8. Coal and wet coal hearth fire or discharge out of the furnace, non-water washed pouring furnace. These measures should be completed within 3 to 5 minutes, to prevent the high oil temperature coke deposits other accidents. 9. normal shutdown, the oil temperature should be reduced to below 100 ℃, stop the pump before. 10. When the outlet pressure differential below the set value, the induced draft fan should outage. Then there is a fault system, feedback should be immediately removed or, if necessary, should pressure fire outage. 11. fireman should stick to their posts, do a good job operating records and shift work, and regular inspection and maintenance equipment.

As far as we understand fast 4t fired boiler commercial automatic cambodia, Qinhuangdao City, Hebei Province to respond positively to tackling air pollution control actions, and intensive phase-out of coal-fired boilers. May 22, Qinhuangdao City Funing District launched the first action, a paper mill for a six tons of coal-fired steam boiler on-site demolition work. By Comrade Sun Guosheng, deputy director attended the action, and announced that coal-fired boiler central demolitions began.

Party Secretary Sun Zhichuan, Wang Hua district leaders to direct the demolition work, the Municipal Bureau of ecological environment, the ecological environment Branch area, technology and industrial Information Bureau, staying Town, elm Town, the next village management area, Funing town and other relevant units attended centralized demolition action.

The demolition operation was eliminated Qinhuangdao unified action to ban coal-fired boilers, Funing District is the city's main venue for the implementation of this action. 2019 coal-fired boilers area demolished 33 sets of objectives and tasks is that this concentrated action demolish 14 units, 12 sets of new coal-fired boiler investigation, a total of 26 sets of 248 tons of steam coal use is expected to reduce the amount of 149,444 tons, 145.73 tons of sulfur dioxide reduction , 439.37 tons of nitrogen oxides, soot 37.36 tons.