6 ton per hour heavy oil diesel steam boiler for industry

Hefei Limin Pharmaceutical Co., Ltd. Nanjing Military Region, formerly the backbone of pharmaceutical companies, the main drug is slowly swallow rather teabag, relying on advanced R & D platform to carry out contract manufacturing, OEM OEM and other business cooperation. China's environmental protection development trend began to take shape, many environmental policies have been put forward for a positive response to the national environmental policy, Limin Pharmaceutical decided to introduce a gas station 6 ton per hour diesel steam boiler for industrys. After an investigation of the boiler market, Limin Pharmaceutical fast boiler is strong comprehensive strength and wealth of experience working for many years in the pharmaceutical industry to attract, party fast according to the actual needs of customers for its recommendation of one of Taiwan 4 tons of steam condensate gas-fired steam boiler (WNS4-1.25-YQ).

SZS oil gas fired horizontal 6 ton per hour diesel steam boiler for industry

Horizontal industrial steam boiler manufacturer

There are two series of 15 tons of oil and gas boilers produced by ZBG. These two boilers are environmentally friendly packaging boilers carefully developed by ZBG. Many customers pay more attention to the price of the boiler, and the type and specific parameters of the oil and gas boiler will have a great impact on the price of the boiler. To know the price of a 15 ton oil and gas 6 ton per hour diesel steam boiler for industry, you need to have a general understanding of some specific information about the boiler.

Oil-fired boiler maintenance methods "" A lot of companies because after the purchase of oil-fired boilers, Careless maintenance process, with the result that the useful life of oil-fired boiler is greatly reduced. So how should it be maintenance of the oil-fired boiler? The following article gives you a detailed analysis. After conducting oil furnace shut until the furnace cooled water to the boiler water below 70 ℃ exhausted, the internal completely remove the dirt, washed away, all manholes, hand holes, valves and other pipeline tight blockade, and with a blind plate and running boiler completely isolated. After all of the alkaline solution is added, and then injected into the soft water boiler, until the water coming out from the highest point till the boiler, the water supply valve is closed, note that the average mixing an alkaline solution inside the boiler. Stop oil-fired boiler more than a month, maintenance of law should be dry, wet maintenance shutdown method can be used the following month. To schedule the maintenance period Microflame oven, schedule the water cycle, the concentration of the alkaline solution throughout the same. Every five tests also take a basic solution, such as alkalinity less than 5-12mmol / 1 solution should be applied. Periodic inspection outage before the oil-fired boiler furnace, should be prepared to work the following three aspects: (1) review the registration technical dossier furnace boiler and boiler furnace usage understand. In order to fuel the transformation within the furnace boiler external inspection be aware, the general need to understand: the transformation of the electric furnace boiler design, manufacture, installation; boiler furnace revamping; boiler furnace use history and usage; boiler furnace water treatment case ; boiler performance and other rules and regulations. (2) Check before shutdown preparation. First, with the production schedule maintenance shutdown date, and then let the transformation of the normal furnace boiler shutdown program shutdown, but slowly disheartened. Injecting cooling method may be employed downcast water, replacing the water cooled furnace and the furnace into line ventilation cooling. When the boiler water temperature was reduced to 70 ~ 80 ℃, before drainage. Open all doors hole. When the door opened, to prevent warm water, steam jet man suddenly burns. Corresponding to the passage blocked pipe on the transformation test furnace boiler steam, water supply, sewage and other pipes and other run in the transformation of the electric furnace boiler. Blocked with shutter have sufficient strength to avoid being broken drum high pressure medium. To clear the blocking position is indicated. And other operational boiler furnace flue should be communicated reliably cut off. Also to clear the transformation of furnace soot and scale boiler by warm surface. (3) test preparation tools and lighting. In order to ensure the smooth entry inspection, the inspector should prepare the necessary equipment, tools, measuring tools and safe and reliable lighting devices.