Best Selling boiler 1 ton Energy Saving Kuwait

The improved best selling boiler 1 ton energy saving kuwait house area for the return water temperature is 0 ~ 60 ℃ possible. When designing the pipe network, choose economical than the pressure drop, reducing the cost of heating network.

Recently, the letters and the ecological environment unit, the letter of "best selling boiler 1 ton energy saving kuwait air pollutant emission standards" in the "gas boiler exhaust pipe predetermined height of not less than 8 meters, within 200 meters from the building around the radius of the new boiler room chimney when was the tallest building in which the chimney should be higher than 3 meters "requirement questions.

First, the new urban gas boiler chimney should be performed outside the specified height is 3 meters above the surrounding buildings (there are many communities within 200 meters around the building height higher)?

Second, on the 20t / h steam boiler and above, and more than 14MW hot water boiler to be installed pollution-line monitoring equipment, this means that a single 14MW boiler or boiler means the total audience of 14MW?

Third, for example, I have more than 2MW heating station natural gas hot water boiler 7 units, exhaust gas through the two exhaust pipe emissions, the need to install pollution monitoring equipment?

A "boiler air pollutant emission standards" (GB13271-2014) states that "fuel, gas boiler stack height of not less than 8 m, particularly boiler stack height is determined by the EIA document approved. Chimney around the new boiler room when there is a building within a radius of 200 meters, the tallest building in which the chimney should be higher than 3 meters. when there is a building within 200 meters around the new boiler house chimney radius, "according to the provisions in the new urban area gas boiler should be implemented", the chimney should be higher than the provisions of the tallest buildings in more than 3 meters, "the.

Two, 20t / h steam boiler and above, 14MW and more hot water boiler must be installed in the line monitoring apparatus contaminants "14MW and more hot water boiler" means a single boiler.

Third, on the "exhaust gas through the two exhaust pipe emissions, the need to install pollution monitoring equipment" problem, according to "People's Republic of China Air Pollution Prevention Law" Article 24 "key sewage units should be installed, using air pollutant emissions automatic monitoring equipment, and environmental protection departments to monitor network devices, monitoring equipment to ensure the normal operation of public and emissions information in accordance with law. "provisions, as well as the" State Council on the issuance of three-year action plan to win the blue sky to defend the notice "(Guo Fa [2018 ] No. 22) "outfall height of over 45 meters of elevated source, as well as petrochemicals, chemicals, packaging, printing, painting and other VOCs emissions from industrial sources focus, the focus of sewage into the Directory of key areas should be basically completed by the end of 2019 to install flue gas automatic monitoring facilities, the country should be basically completed by the end of 2020 the automatic installation of flue gas monitoring facilities. "requirements, if the exhaust pipe where the company was listed as key units of sewage, flue gas monitoring facilities should be installed automatically, otherwise, no installation.

2, using the air preheater

An air duct provided at the contact economizer preheater, the apparatus may effectively increase the temperature of the combustion air and the fuel to improve ignition conditions. Very beneficial to the boiler combustion conditions.

3, the combustion system modulating bidirectionality factory fuel boiler design specification has a certain flexibility, different media in effect outside the combustion process are different, adjusting the embodiment, with the economizer and the air preheater using, the boiler temperature exhaust emission control at a suitable temperature, that make full use of heat energy, but also to ensure the integrity of the structure and function of the relative equipment, environmental protection, energy saving, security and development for all of us social responsibility.

How module best selling boiler 1 ton energy saving kuwait blowdown 1) opening the valve inside the sewage; (2) open the valve slowly outward discharge of sewage to be warmed and sewage pipes; (3) on and off several times from the outer sewage valve, slowly red wash liquid in the boiler fouling, so that the liquid discharge best dirt; (4) turn off the valve inside the sewage, between these two discharge of sewage water in the valve drained; (5) turn off the valve outside the sewage, the sewage termination.