Manufacturing companies Industrial 2t Natural Gas boiler Cambodia

How many two tons mill electric steam manufacturing companies industrial 2t boiler cambodia price for the textile mills, there are also many places due to abundant natural gas resources department, need to use electric heating steam boiler, so that, for businesses, in the choice of electric steam boilers when . It must be to look at the country of boiler manufacturers for comparison, in particular, to pay attention to the brand of the steam boiler manufacturers and after-sales service. In this case, for enterprises, pre and post sales are guaranteed. Recently, a textile enterprises to fast boiler consulting, want to buy an electric steam boiler, but for the specific needs of the model and the price is not very understanding. This is the fast boiler technician needs the help of accounting price after accounting concluded that two of the mill with a 2-ton electric steam boiler is possible. Currently, the model price of about 200,000. Therefore, the company for the price of two tons electric boiler steam mills already have a detailed understanding.

The party soon provide us with three hot water manufacturing companies industrial 2t boiler cambodia output foot, gas combustion, efficiency is very high, for us to save a lot of fuel costs. Moreover, these hot water boiler can be achieved by adjusting the full 24 hours a use hot water to meet the daily needs of old people. --customer feedback

You must know the manufacturing companies industrial 2t boiler cambodia energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

The 4ton biomass steam manufacturing companies industrial 2t boiler cambodia is specifically designed to use biomass pellets as fuel. Installed at Vietnam, a tobacco processing facility, the boiler reduces the use of fossil gas. Operating at 16 bar pressure, the boiler has a nominal capacity of 4 ton per hour of dry, saturated steam.