where to order commercial gas soup boiler

In fact, the where to order commercial soup boiler "coal to gas" fully able to achieve energy, mainly reflected in:

1, high combustion efficiency

In accordance with article 1.2 13.3.6 to 13.3.8 "where to order commercial soup boiler design specifications" (GB50041-92): gas-fired boiler provided in the other buildings should be not less than 3 times the amount of ventilation, ventilation hour It does not include the amount of combustion air volume. Dangerous operating room and the like between the gas regulator, the amount of ventilation per hour, should be less than 3 times, when not meet the requirements natural ventilation, mechanical ventilation should be provided, and should be less than 8 air changes per hour accident ventilation times. Fuel pump and reservoir 45 ℃ flash point less than the underground tank of combustible oil, except that natural ventilation, the fuel pump mechanical ventilation 10 air changes per hour should times, six times per hour ventilation should depot mechanical ventilation. The above three are in each room in order to ensure exclusion of air and flammable hydrocarbon disposed a predetermined minimum ventilation rate.

The power plant in Bulgaria consists of 11 where to order commercial soup boilers sized 160 and 220 t/h, fired with natural gas and coal. In order to meet the changing emission regulations and to reduce the fuel cost the customer was interested in replacement of 2 existing 220 t/h gas-fired boilers with a new CFB boiler fired with petcoke and Ukrainian semi -anthracite. Gas boilers no 7 and 8 were demolished, this space was used for a new CFB boiler plant .

Recently, Yuhang District, Hangzhou, Zhejiang Province, a printing company 20 steam tons / hour of coal-fired where to order commercial soup boilers have been stalled, this is the last Yuhang district an industrial coal-fired boilers, which marks the shutting down of Yuhang District of industrial enterprises to bid farewell to coal energy structure of coal turned to natural gas and other clean energy, Yuhang District from entering the industrial coal-free era.

Yuhang District "coal-free zone" construction of road resistance and long. As a major industrial zone, a long time, Yuhang District to focus on coal-fired thermal power plants, coal-fired boilers and other industrial enterprises formed a coal-dominated energy consumption structure. In 2014, the maximum amount of coal Yuhang District reached 783,600 tons. Large coal consumption that emissions of sulfur dioxide, dust and the like remain high for many years.

In order to further deepen the air pollution control, to win the Battle of the blue sky, Yuhang District, from 2017, will gradually tangqi thermoelectric, thermoelectric and sea Chongxian three coal-fired thermoelectric power plant with all closed down, the sea of ​​clean natural gas for thermoelectric realized heat. 3 thermal power plant shut down so that the region's coal consumption, pollutant emissions and other indicators to achieve substantial reductions in road construction of "coal-free zone" has taken a crucial step.

Yuhang bid farewell to coal road this did not stop. While coal-fired thermoelectric accounted for the bulk of coal consumption and pollution emissions, but only out of coal-fired power plant is not enough. 2018, the government decided to promote taking advantage of Yuhang District, the region within the remaining four coal-fired industrial enterprises (Coal Products) pot (kiln) furnace closed down or eliminated or modified.

Yuhang District to increase the proportion of electricity consumption, and actively guide the region's energy unit of coal to electricity, oil to electricity, gas bottle to electricity, the construction of an orderly distribution grid, promoting smart grid construction; continue to improve the level of utilization of natural gas, and urban area in addition to all the town cormorant birds, Baizhang full realization of natural gas supply, a total of 850 kilometers of natural gas pipeline construction and municipal gas transformation 45000; to promote the application of photovoltaic power generation, the region's industrial and commercial enterprises amounted to 173 megawatts of photovoltaic capacity building distributed, clean energy applications has taken shape in Yuhang District.

According to statistics, "Thirteen Five Year Plan" (2016-2020) since the implementation of environmental statistics included in Yuhang district industrial enterprises coal consumption from 588,900 tons in 2016 down to 38,900 tons in 2018, to drop in early 2019 0.

A substantial decline in coal consumption is brought to slash emissions of pollutants and air quality improved significantly. 2018, the main pollutant urban air Linping PM2.5 average concentration of 38 micrograms / cubic meter, decreased 40% in 2015. Region sulfur dioxide emissions of 7,833 tons in 2014 to 2018 had dropped more than 90%; NOx emissions to 8490 tons in 2014 to 2018 had dropped more than 60%.