6t coal boiler Low Price Industrial Brunei

Cofiring biomass in coal fired 6t coal boiler low price industrial brunei

Cofiring biomass in a coal fired boiler is like a cart drawn by a horse and a mule. What are the advantages? It took millions of years for decaying organic matter to form into coal. Biomass on the other hand is organic matter that is only a few days old. The composition and characteristics of biomass is different from coal and makes cofiring biomass and coal difficult.

Fangkuai Boiler has carried out a large-scale welding revolution, eliminating traditional manual welding operations with low efficiency, low accuracy and poor stability, and converted it to the use of mechanical welding equipment with high efficiency, high accuracy and high stability for automatic operation . Realize welding automation of all important parts from the drum to the tube sheet. The submerged arc welding, argon arc welding, carbon dioxide welding and other welding details of the process have also made corresponding intelligent changes, workers' welding environment is cleaner, and the quality of 6t coal boiler low price industrial brunei welds is more guaranteed.

25 tph SZS gas-fired steam 6t coal boiler low price industrial brunei for cigarette factoryFrom 2014, Baoji City began to implement natural gas projects and vigorously implemented coal-to-gas conversion projects. Baoji Cigarette Factory is one of the major backbone enterprises of the China National Tobacco Corporation and is the largest cigarette manufacturer in the northwest region. In line with the environmental protection policy, Baoji Cigarette Factory implemented the "coal to gas" project. Through bidding activities, it cooperated with ZOZEN boiler to dismantle 35 tph coal-fired boilers and install 25 tph SZS gas-fired steam boilers to improve boiler operation levels and reduce air pollutant emissions.

Note the use of an industrial 6t coal boiler low price industrial brunei fan which 1, strengthen the operation and management, ban illegal operation. Industrial boiler drum fan up and running, there must be strict rules. The induced draft fan starts to be unloaded, non-load starting, particularly when the boiler stoked, flue gas temperature is too low, such as the induced draft fan starts with load (i.e., open the blower inlet damper or fully open), a current will start increased a lot, and start-up time is too long, the fan motor can overheat, overloading is likely to burn out; when the boiler (particularly pulverized coal) Jan-fire operation, pay attention to drums, fan's opening sequence, can not be reversed. I.e., first open fan, run for 10 minutes, and to exclude the furnace flue fouling or flammable gases, before the blower starts. If the first open blower, the induced draft fan, so that both the induced draft fan load is increased, so that the induced draft fan motor overheating burned, and the furnace may lead to explosion. 2, industrial boiler flue gas dust removal blowers take measures to regularly clean the flue, induced draft fan to improve the working environment. Dust removal equipment units to strengthen the dust removal operation and management, improve the efficiency of dust removal; no dust removal equipment units to time quantitative dosing into the boiler furnace special cleaning agents, and timely removal of fouling of the flue, the flue avoid clogging, the impeller damage accidents. 3, the impeller blade surface hardening treatment to improve the wear resistance of the blade. Since the large fan boiler drum conveying high temperature flue gas is about 200 ℃, the flue gas contains large amounts of fly ash, SO2 and other corrosive gases, badly worn fan blades, fan output prone to drop, vibration, such as rupture of the blade. Therefore, to deal with a serious face or wear parts of welding blades to improve the wear resistance of the blade. Use DC welder welding, arc welding using manual method using a dedicated fan hardfacing strip (e.g., wear No. 1, Mo-Cr-B carbide electrode wear, etc.), and the electrode wear in 300 ~ 350 ℃ drying 1 hour use. Before welding, the surface of the blade should be fouling, rust cleaned, preheated to 100 deg.] C, with a small current, low voltage, temperature and speed, short arc welding symmetry. Practice has proved that, after surfacing treated leaves, wear resistance greatly improved, not only changed the fan impeller often wear, but also laid a good foundation for the safe operation of the fan. 4, insist on Boiler Fan periodic overhaul, maintenance of strict quality control. Industrial boiler drum Fan to be overhauled on a regular basis. The elimination before the accident hidden danger in the bud, to overhaul a comprehensive, thorough, carefully check the wear, the impeller shaft and impeller balanced operation, with or without internal connections loose, collision, inlet baffle switch is flexible and bearing lubrication and cooling Happening.