3 ton heavy oil steam boiler from China

Advantages of you know that hot water boiler fast boiler below Henan small taping everyone understand the advantages of a hot water boiler, burner equipped with imported brands, high intelligence level, automatic purge command in accordance with the control panel, automatic electronic ignition, automatic lit, air oil (gas) accounted for automatic adjustment, characteristic An Kuaiping stable, easy to ignite. And there are flameout protection device to ensure safety will operate. 2, hot water boilers board computer, all of the action is stored in a wonderful smart chip, a furnace key switch, automatic automatic, constant temperature operation, the customer can be provided startup, shutdown time, set after, no responsible person on duty, convenient, save effort. 3, the outer fire tube inserted spoiler natural resistance, ease exhaust rate, to enhance heat transfer, low smoke chamber to exclude dust temperature, reducing thermal damage, save fuel. 4, the font sizes that vary depending on temperature, and easy to grasp the management status of the heating furnace system, a temperature of from 10 deg.] C to 90 deg.] C can be easily set to the automatic heating furnace or heating system for the customer to produce basic necessities, bath with boiling water. 5, control of boiler water temperature controlled circulating pump according to the start-stop, boiler water exceeds the set hot water circulation pump starting when the temperature limit is less than the lower limit set temperature of hot water circulating pump terminates. 7, with the bare metal disposed over temperature maintenance (the furnace temperature is wide, burner work done automatically terminated and beeps again over temperature maintenance time (shell furnace temperature exceeds 105 deg.] C, the secondary circuit is automatically disconnected), anti-aircraft burn less water maintenance (when the boiler water is less than the low water, the furnace terminate work to do and outgoing beeps), furnace leakage protection (technical inspection to control electrical appliances go, after the break, will automatically disconnect the power of the original) .8, superheated steam oven according Zongtisheji, no pressure in the heating furnace, the security will be no risk of .9, double insulation use high centrifugal glass wool, steel tile known as black boxes, less thermal damage, anti beautiful rust.

When the gas 3 ton steam boiler from china installation is complete, you should first check whether the internal boiler tidy and clean without foreign body, and then close the manholes and valves. Oil (gas) pipeline, and the return line of compressed air to blow the pig debris, and then connect the burner fuel supply port, check the connection is tight, then a predetermined pressure test.

By the end of 2018, Wu'an Municipal People's Government of Hebei Province issued a notice on the issuance of "blue sky Wu'an winning three-year action plan to defend the war", referring to the notification: By the end of 2019, the city has a depth of discharge conditions for reconstruction the coal-fired units completed in-depth treatment, meet the relevant standards. Implementation of coal-fired power management depth. Implementation of coal-fired power plants and coal-fired units emission performance management, emissions of coal-fired units to assess the performance rankings, and resolutely out of shutting down environmental protection, energy consumption, security is not up to 300,000 ten million coal-fired units.

First, the implementation of in-depth treatment of coal-fired power plant

Implementation of coal-fired power plants and coal-fired units emission performance management, emissions of coal-fired units to assess the performance rankings, and resolutely out of shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. 2018, 2019, 2020, respectively, by province and Handan given task given the amount of closed down. Heating demand complete transformation of 600,000 kilowatts grade pure condensing units, high-capacity, high-parameter units accounting for 90%

on.

Special action to carry out deeper cuts power industry, coal-fired units in the original ultra-low emissions, based on the further optimization of operational management, improve pollution control facilities, improving removal efficiency, the implementation of colored smoke plume power plant management. Before the end of 2019, the city has deeper emission coal-fired units to complete the transformation of the conditions of the depth of management, meet the relevant standards.

Second, to carry out special treatment industrial furnaces

The development of industrial furnaces comprehensive remediation plan to carry out an intensive investigation of industrial furnaces, establish classification list management. Stringent emission standards, increase efforts to eliminate non-compliance of industrial furnaces, accelerate the elimination of small and medium gas furnace. Under the premise of resources to implement and encourage industrial furnaces use electricity, natural gas and other clean energy or heat from the surrounding power plant. Ban coal stove, substantially eliminated cogeneration heating pipe network coverage in the range of coal heated oven (furnace); out hearth diameter of 3 m or less gas furnace fuels, natural gas use conditions have temporarily , building a unified center of clean coal gas principle; prohibition blended with high-sulfur petroleum coke.

Oil-fired boiler maintenance methods "" A lot of companies because after the purchase of oil-fired boilers, Careless maintenance process, with the result that the useful life of oil-fired boiler is greatly reduced. So how should it be maintenance of the oil-fired boiler? The following article gives you a detailed analysis. After conducting oil furnace shut until the furnace cooled water to the boiler water below 70 ℃ exhausted, the internal completely remove the dirt, washed away, all manholes, hand holes, valves and other pipeline tight blockade, and with a blind plate and running boiler completely isolated. After all of the alkaline solution is added, and then injected into the soft water boiler, until the water coming out from the highest point till the boiler, the water supply valve is closed, note that the average mixing an alkaline solution inside the boiler. Stop oil-fired boiler more than a month, maintenance of law should be dry, wet maintenance shutdown method can be used the following month. To schedule the maintenance period Microflame oven, schedule the water cycle, the concentration of the alkaline solution throughout the same. Every five tests also take a basic solution, such as alkalinity less than 5-12mmol / 1 solution should be applied. Periodic inspection outage before the oil-fired boiler furnace, should be prepared to work the following three aspects: (1) review the registration technical dossier furnace boiler and boiler furnace usage understand. In order to fuel the transformation within the furnace boiler external inspection be aware, the general need to understand: the transformation of the electric furnace boiler design, manufacture, installation; boiler furnace revamping; boiler furnace use history and usage; boiler furnace water treatment case ; boiler performance and other rules and regulations. (2) Check before shutdown preparation. First, with the production schedule maintenance shutdown date, and then let the transformation of the normal furnace boiler shutdown program shutdown, but slowly disheartened. Injecting cooling method may be employed downcast water, replacing the water cooled furnace and the furnace into line ventilation cooling. When the boiler water temperature was reduced to 70 ~ 80 ℃, before drainage. Open all doors hole. When the door opened, to prevent warm water, steam jet man suddenly burns. Corresponding to the passage blocked pipe on the transformation test furnace boiler steam, water supply, sewage and other pipes and other run in the transformation of the electric furnace boiler. Blocked with shutter have sufficient strength to avoid being broken drum high pressure medium. To clear the blocking position is indicated. And other operational boiler furnace flue should be communicated reliably cut off. Also to clear the transformation of furnace soot and scale boiler by warm surface. (3) test preparation tools and lighting. In order to ensure the smooth entry inspection, the inspector should prepare the necessary equipment, tools, measuring tools and safe and reliable lighting devices.