vertical waste oil fired hot water boiler

Matters needing attention in loading and installation of Gas-fired Steam Boiler

Gas-fired steam boilers are a very wide range of special equipment, usually built in boiler rooms. However, in the process of loading and installation, some problems must be paid attention to, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

Wns oil and gas boiler in Russia

ZG boiler’s boiler was exported to Russia again. The boiler that was exported this time was a WNS series boiler, which is a 7MW gas-fired hot water boiler. Its main purpose is to heat the hotel.

Fast boiler particularly strong technical team, they listened carefully to our needs and give us tailored technology solutions, from boiler production, transport to the site installation and commissioning took only 35 days time, all aspects of the deal in place, the boiler quickly it is put into use. --customer feedback

7MW WNS series gas-fired vertical waste fired hot water boiler project for Sinopec Beijing Design InstituteA hot water boiler is an important heat supply equipment in the national economy, there are two main functions: supplying bathing water and heating water. Sinopec Beijing Design Institute (BDI) is the first design institute specializing in chemical and petroleum refining engineering since the establishment of PRC; it was restructured and amalgamated with former Sinopec Engineering Incorporation (SEI) and Beijing Petrochemical Engineering Co., LTD. into New Sinopec Engineering Incorporation, affiliated with Sinopec Group. The major job of New Sinopec Engineering Incorporation is oil refining and petrochemical design. Chinese government boosts the "coal to gas" or "coal to electricity" projects to protect atmospheric environment and promote energy transformation. BDI decided to eliminate hot water boilers that cannot meet the emission standards and introduce energy-saving and environment-friendly ones to support the development of environmental protection; they decided to use the natural gas as fuel. ZOZEN stood out from the fierce competition of boiler market and gained the favor and trust of BDI, ZOZEN provided BDI with 4 sets of 7MW gas-fired boilers (WNS7-1.0/115/70-Q). This series of boilers is the typical environmental protection and energy saving product, full automatically running is safe and reliable; the thermal efficiency is over 98%. All figures of the boilers are above the design requirements and have reached the international advanced level.