0 7 MW heavy oil boiler in India

Burner and flue installation and electrical installation and the fuel supply system of the burner 1, burner 1) before installation read "burner manual", according to the installation requirements. 2) Burner mounting flange, the middle requirements, to ensure the burner to the 0 7 mw boiler in india flue gas does not leak at the interface. 2, the installation of fuel supply system (see schematic) Note: To prevent a fire caused by generation of static electricity in the fuel tank, the tank should have a good grounding. 1) supply system tank top tank top-feed system suction recommended distance between the back plane and the tubing inside diameter of the oil pump axis, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm0.51.03030401.535452.03535452.540503.0404050 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 2) the distance between the bottom of the tank bottom of the tank supply system supply system pipe inner diameter recommended oil pump axis and a plane, the total length of the suction pipe Hm, m, no greater than DL6-34DL40-75DL100-250Di = 10mmDi = 14mmDi = 16mm1.03030401.535452.03535452.540503.04040504.045 Notes: (1) when there is an elbow or valve on the suction pipe, each of the length of the suction pipe to be minus 0.25m. (2) Di recommended internal diameter suction pipe and return pipe. 3, gas pipe installation requirements Burner gas line itself has been connected, the intake port, the intake pipe bends should be minimized and good sealing performance requirements, to prevent leakage. (Iv) a chimney installation, to prevent leakage, the leakage of smoke, to prevent smoke inhalation chamber. 2, a vertical mounting, a right angle bend bends should be avoided. 3, the top of the chimney must be water-resistant measures. (E) mounting a power switch with electrical connection box 1, the power switch should be considered easy to operate, away from heat, fixation, meet the design requirements. 2, the use of 220V (380V), 50HZ power source, and a ground line. 3, voltage instability in the region use, should be safe regulators. Or affect the normal operation of the combustion engine. 4, the power cord to the electrical box must be connected in strict accordance with the requirements, otherwise, there will be dangerous!

Henan 0 7 mw boiler in india which measures to reduce soot integrity of the well-known and reliable Henan boiler manufacturers, provides a number of high-quality, durable oil-fired boiler according to market and customer needs, we know that the boiler combustion direct impact on the economic benefits of the unit, and the air quality of the environment . In order to improve the thermal efficiency of the boiler, reducing the amount of smoke and reduce dust, what measures can reduce dust Henan boiler there? First, to ensure adequate supply of air we know that the ratio of carbon dioxide is the carbon dioxide content of flue gas volume to the total volume of fuel in Henan boiler combustion under normal circumstances, the volume of carbon dioxide in the flue gas is constant, and the flue gas the total volume affected by the amount of air, no doubt increase in the amount of air is bound to the carbon dioxide content of the flue gas reduced accordingly, thereby reducing the soot, so to supply the appropriate amount of air. Second, the furnace temperature to maintain a certain temperature and excellent combustion temporal quality Henan boiler fuel is burnt, an important condition for soot, and the combustion of each boiler is generally suspended combustion, it is the central temperature of Henan boiler furnace is desirable to control more than a thousand degrees, but also to ensure there is enough fuel residence time in the boiler, so only in order to completely release heat and smoke reduction. Third, the amount of adjustment of fuel and air flow when the boiler load Henan vary widely, with different pore sizes may replace atomization natural oil is increased or decreased, to reduce dust, while within a certain range, as the wind amount of oil fog mixed with the air will be improved, thus contributing to burn, but if the wind increased volume will increase heat loss, resulting in increased coke dust tail, so users should timely adjust the air supply. Therefore, in order to promote complete combustion of fuel, to reduce the amount of smoke, reduce dust, the purpose of breathing clean air, not only to properly regulate the air distribution to ensure the right amount of air supply, but also to maintain a certain high Henan boiler furnace temperature and combustion time, Further, in the air blowing operation should be adjusted according to the amount of fire nozzle, and a carbon dioxide content of flue gas.

Construction of gas steam 0 7 mw boiler in india steam requirements for the construction of a gas boiler requirements, gas steam boiler installation for the construction of the boiler room have certain requirements, must comply with national requirements in the construction process. Gas and steam 1, the construction of a gas steam boiler room requirements 1) boiler room must comply with the "boiler energy saving technical supervision and management regulations" and "industrial boiler room design specifications" requirement. Gas steam 2) boiler room should have sufficient light and good ventilation, have the necessary antifreeze measures. And boiler room should stay away from schools, housing and densely populated areas. 3) the position should be close to the boiler room heating equipment, in order to reduce head losses and heat loss from the hot oil piping circulating pump. 2, furnace heat carrier device is arranged in claim 1) the sump should be lower than the lowest position of the heat carrier furnace and heat system 1 m, in order to put the net organic heat boilers and systems, sump and furnace heat carrier spacing less than 5 m or separated by a partition wall. It should be fitted with a sump exhaust pipe, which exhaust pipe diameter should be large and specifications than the inflation tube. 2) position of the expansion tank should be higher than the other devices and the piping system, the system must be higher than the maximum bottom level 1.5 m. It should not be installed directly above any one boiler, organic heat carrier to prevent overflow cause a fire. 3) the sump vent pipe, expansion tank, should be connected to the outdoor safety. Can not be mounted on the vent pipe to the valve, to ensure that the tank, the expansion tank to atmosphere to ensure atmospheric pressure operation. 4) the high volume of the expansion tank should be greater than 1.3 times and all the organic heat carrier furnace heat the entire heating systems is at the operating temperature is increased due to thermal expansion of volume. 5) low volume tank furnace heat carrier to be less than 1.2 times the total amount of organic heat. 6) hot oil circulation pump should be at least four weeks for 0.5 m space, and the inspection to ensure the installation routine, the need for maintenance.

Still 8 cultural and creative industrial park is located in the Chaoyang District, Beijing, Bali Zhuang Chen Lin, No. 2, construction area of ​​493,300 square meters. Surrounded by quintessence of Court, Red Sandalwood Museum, Shanxi Museum and other famous attractions. Due to its special geographical location, has very stringent requirements for providing heat 0 7 mw boiler in india plants. Carefully selected to finalize cooperation with our company, signed a two He Lide series complete condensation pressure hot water boiler.