20 ton Industrial Supplier boiler Myanmar

Waste hear recovery 20 ton industrial supplier boiler myanmar

Global CemPower Conference is to take place for the third time in London in 2015, and will look at a topic that accounts for one third of the cement industry's total costs: Electrical power.

ZG CFB 20 ton industrial supplier boiler myanmars is a kind of technology innovation and environment-friendly boiler.This type boilers are the leader in the market and have been used in industrial company very widely.This essay is a project about CFB boilers exported to Ukraine used in Paper Mill.The Equipment Paper Mill needed is SHX30-2.5/400-W.

Fang faster work on clean fuel 20 ton industrial supplier boiler myanmars more than twenty years, whether it is research and development or manufacturing fields have achieved remarkable results. The launch of the "Euromonitor 5" series boilers, the company's new low-nitrogen boiler, using advanced FGR combustion technology, nitrogen oxide emissions below 30mg / m3, our first-tier cities can be used normally. Remote monitoring system is to attract the attention of the participants. Jumping curve data, real-time display operating status boiler; detailed data analysis and fault early warning program, Fang fast "black technology", making the boiler to get rid of "silly Big Ben rough" image and become intelligent high-tech incarnation.

Overpressure stop furnace and timely relief; low water level is not automatic replenishment, immediately replenishment manually; the (automatic or manual) stop switch transposed, and the relief after replenishment until normal reheating.

2, the control cabinet when overpressure occurs, phase, low water level, the high level alarm, press the mute button to check the cause of the malfunction and immediately removed; if the alarm is not more than 3 minutes in time, easy to burn bell.

3, in case when the phase indicated: A, to check whether the power supply phase. B, check the bell is burned out. C, check the contactor coil, a transformer, etc. is burned. After completion of the above problems troubleshooting timely replacement element, and the secondary fuse circuit, fault and inform the manufacturer in case of complex or repair guidance.

4, when the frequent replenishment, check whether the water supply pump check valve failure, fill the water tank upside down, shutdown should be promptly repaired or replaced.

5, regular (two weeks) to check the boiler water quality so that it meets the requirements, the need to frequently boiler blowdown.

6, on a regular basis (7-15 days) to check water level gauge scale and clean the electrode can be shutdown if necessary check.