tph gas boilers company

IBR Small industrial tph boilers company in factory

IBR Oil or Gas Fired Boilers :

Biomass fired tph boilers company fuel characteristics

Biomass fuel has the following main characteristics compared to coal:

1. Low sulfur content. Biomass fuels are mostly less than 0.2% sulphur, and there is no need to install a gas desulfurization device when burning, which reduces costs and is environmentally friendly.

2. Most of the carbon in the biomass fuel combines with hydrogen to form a low-molecular hydrocarbon. After a certain temperature, it thermally decomposes and folds out the volatiles. Therefore, biomass fuel is easily ignited,

3. The density is small. The density of biomass fuel is obviously lower than that of coal, and the texture is relatively loose, especially crop straw, which is bulky.

4. Less carbon. The highest carbon content in biomass fuels is only about 50%, which is equivalent to the carbon content of lignite with less generation.

5. Straw biomass contains a large amount of alkali metal elements (mainly potassium and sodium). In the combustion process of biomass, the main performance is that the adhesion of ash is strong, and slagging and clogging are likely to occur in the furnace. Ash accumulates on the heated surface of the tail.

Comparison of coal-fired steam tph boilers company and gas steam boiler? Which is more cost-effective? There will be new users are asked coal-fired steam boiler and gas steam boiler which is more cost-effective in a number of economic operation? Believed to be ready to buy a steam boiler of every business relationship or personally, with you today, I will work together to analyze these two boilers in operating costs to do a comparison. First, the first point to analyze procurement costs: Because gas steam boiler in the annex above techniques and configurations to be clear lead and coal-fired steam boiler, gas steam boiler supporting a dedicated burner, put the cost of just one burner price opened, so that the same tonnage of steam boilers, steam boilers high gas prices than coal-fired steam boilers and more. The second point to analyze construction costs: The costs mainly from the boiler room, boiler tubes of steam investment funds. Where the coal-fired steam boiler because more appropriate auxiliary equipment, so in the boiler room construction funds to be more. There is a gas steam boiler automatic control operation, and automatic alarm and automatic protection function. Connected to the gas pipeline, the burner will automatically supply costs can effectively save staff. Coal-fired steam boiler because of the need of coal on the program, so in terms of personnel expenses wage will be larger. The third point to analyze the environmental cost: major review means that the coal-fired steam boilers now more stringent. The gas steam boiler due to the operation of the economy, environmental protection and energy saving, as well as government policy to encourage more and more widely used. The fourth point to analyze the cost of fuel: coal-fired steam boiler will be much higher than the steam boilers in gas fuels. After analyzing the above four points of view on coal in order to save operating costs more than gas steam boiler steam boiler, but coal-fired steam boiler steam boiler environmentally friendly than gas in environmental protection, environmental pollution is now increasing in recent years, so the state to environmental pollution control is relatively strict, so in accordance with the requirements of environmental protection point of view has an advantage gas steam boiler.

Before the end of December 2019, the new installed capacity of 340,000 kilowatts of new energy. Among them, the wind power installed capacity of 300,000 kilowatts; biomass 15,000 kilowatts; gas generating 25,000 kilowatts.

According to "Shanxi win the Battle of Blue Sky three-year action plan" (Jin Zheng Fa [2018] No. 30) "before the end of October 2020, the county (city) clean heating up to 100% coverage of built-up areas, rural areas clean heating cover rate strive to achieve more than 60 percent "requirement, in line with the requirements of the priority development of clean coal-fired heating and industrial waste heat heating establish other cleaning to clean the main central heating, coal to gas, coal and other heating supplemented by electric change, # 3 quality coal reveal all the details of the clean heating system.

Before the end of October 2019, the city completed the transformation of clean heating 81400, of which urban 02900, Zezhou 23200, 20100 Gaoping City, Yangcheng County, 20100, 07200 Lingchuan County, Qinshui County 07900. Ongoing supply of high-quality coal and replacement work, the city set up civilian clean coal supply point 21, clean coal alternative bulk coal users 21.3362 million.

Accelerating positive electricity as the focus of urban central heating project, the expansion of positive electricity heating area, the phasing out of the city heating company, constant light thermoelectric, constant light five heat plant and Shanxi Coal Northern Rock Shop Area central heating coal-fired boilers.

Before the end of September 2019, the completion of Jincheng Fusheng Iron & Steel Co., ultra-low emission transformation, ultra-low emissions to meet three conditions: First, the major production facilities and processes of particulate matter, sulfur dioxide, nitrogen oxides emission concentration to reach the ecological requirements of the Ministry of the Environment ultra-low emission limits, and all of the installation of flue gas line monitoring system and networking with the environment department; the second is stockyard stockpile and transport materials such as dust escaping point to be hermetically sealed, and set up air quality monitoring sites in the factory district; three iron ore, coal and other major production materials and products to achieve rail transport. 2019 October 15, Zezhou autumn Casting Co., Ltd., Shanxi Datong Casting Co., Ltd. and other nine metalworking enterprises sintering, hot stove, yard stockpile and material handling processes with reference to ultra-low emission requirements related to the transformation of the steel industry completion of the ultra-low emission renovation work.

Before the end of December 2019, complete steel, thermal power, coking, coal chemical industry, colored plume governance, promote other key enterprises to develop gas-related colored plume governance, an effective solution to sulfate, nitrate, ammonium secondary conversion problem.

Before the end of December 2019 to complete the materials steel, building materials, nonferrous metals, thermal power, coking, casting and other key industries such as coal-fired boilers (including waste) transportation, handling, storage, transfer and process fugitive emissions such as in-depth treatment.

Before the end of June 16.2019 years, the 34 key towns thermal power, iron and steel (metalworking), chemicals, coke, foundry, mining, coal washing (gangue) plant, heating, building materials (cement, quarries, lime kiln, commercial concrete, brick tile, ceramic) and other companies involved in the installation of bulk material handling unorganized dust monitoring facilities. The scientific development of industrial enterprises dust control program, a clear corporate responsibility flushing and watering areas. Before the end of May 2019, the city's business involving bulk material handling import and export of materials and installation of vehicle washing equipment uptime, installation of access control systems (automatic identification standards to achieve the release of the vehicle) and video surveillance systems (monitoring records kept for more than one year).

Before the end of September 2019, the city completed 52 sets of 4530 tons of steam, ultra-low emissions coal-fired heating boilers 65 steam tons / hour or more coal-fired boilers, as well as municipalities and districts and is located in the county (city) built-up area, biomass boilers jobs. Engineered, the reference oxygen content of 6% under conditions, soot, sulfur dioxide, nitrogen oxides emission concentration of not higher than 10 mg / m, 35 mg / m, 50 mg / m. To complete the transformation of the city low nitrogen gas boiler, the end of October 2019, 1940.15 tons of steam units 610 complete the combustion of gas boiler a low nitrogen transformation, after the completion of NOx emission is not higher than 50 mg / m.

The end of October 2019, the city gas generators flue-depth treatment is completed, in accordance with particulate matter, sulfur dioxide, nitrogen oxide emission limits are not more than 30,200,300 mg / m execution.

Before the end of October 2019, steel, foundry, chemicals, and other enterprises to install CO CO emissions focus automatic on-line monitoring facilities; lime kiln flue gas companies to install continuous on-line monitoring facilities; the use of ammonia desulfurization and denitrification processes or business, the installation of continuous ammonia slip online monitoring facilities, all continuous on-line monitoring facilities and networking environment department.