Seller boiler 10 ton Energy Saving Turkey

After Henan how seller boiler 10 ton energy saving turkey manufacturers of valves, pumps, pump packing change Henan boiler manufacturers boiler valves, pumps, pump, valve stem shaft at both stuffing box packing (commonly known as packing) seal is prevented from leaking pressed gland steam leakage. When servicing valves, packing gland should allow the process to leave some margin. Once this operation is to first heat the stuffing box or valve stem wear, leaking steam leakage occurs. A small leak, Henan boiler factory workers can compress some of the gland to stanch. In the pump, allowing some small amount of water leakage between the filler and the shaft, the shaft in order to maintain lubrication. But excessive leakage is not normal, it needs a little gland. Valve in the open or closed, the steam leakage is not allowed in the valve stem leakage. Henan boiler manufacturers in the valve packing leak is found, to look away from the valve cover Gland process margin, if it is greater than 5mm, you can tighten the gland, or exchange new filler. Henan boiler manufacturers to check whether the gland screw threaded corrosion, nuts are complete. If rust, can be used to clean rust wire brush, and then add some oil, nut Tim should change. Before adding a new exchange, or a filler, it must be tested whether a steam leak from the filler material after the valve is closed, is not determined until the steam leaking, before the new exchange packing. Henan boiler manufacturers generally two situations should be noted: 1 steam pipe always follow a direction of flow, since the general structure of the low-pressure valve as "lower entry on", so that after closing the valve, no packing corresponding steam, i.e., you can change filler. When there are two or more vapor sources, you have to close the other valve related before exchange packing. 2. After closing the valve bleed save gasoline, but also try to see if further steam leakage. If still steam leakage, indicating that the valve spool steam leakage, must take additional measures (such as open and then close a valve or emptying traps, etc.), if still steam leakage, it may not replace the filler, the pipe must wait until there is no pressure, side can be swapped filler. Henan boiler manufacturers add fillers or filler exchange procedure case: the first outer gland nut 1 loosened some of them with a screwdriver to pry the lid long, carefully observe whether to eject a filler. 2. The filler pop out, indicating that there is also pressure, then do not add filler, filler does not pop until proved completed when the pressure has been released, which may be removed nut, pry out the old packing, change or add new filler part of the filler. 3. Finally, and then the gland nut installed. Some of the high-pressure side of the valve has a sealing surface, even if the lower portion of the core and the valve open enough Q, stuffing box sealing surface, so that the steam does not leak. This case, the valve Henan boiler manufacturers may open enough, to ascertain when there is no pressure in the stuffing box, a filler may be added before or exchange packing. After the addition of a filler or replacement work is completed, before turning on the valve must be open trap pipe line, put water in clear, slowly open the valve only gradually turn down the trap, preventing water hammer occurs in the pipe.

In the project, the two 90t/h medium-temperature medium-pressure circulating fluidized bed power station seller boiler 10 ton energy saving turkeys in have adopted the latest energy-saving technology based on fluid state reconstruction, and have become the latest generation energy-saving circulating fluidized bed boiler products that have reached the domestic leading level.

Heating hot water seller boiler 10 ton energy saving turkey blowdown processing techniques which: sewage, is a part of the process of boiler operation, it must be the aim of boiler blowdown pot containing a high concentration of water, as well as corrosion of boiler water and sediment to drain was the boiler water salinity is maintained within a prescribed range, so as to reduce the expansion of the boiler water and the foam layer occurs, thereby reducing the salt content and humidity of steam to ensure good quality of steam. At the same time, the sewage may eliminate or mitigate fouling in the evaporator by the surface of the pipe.

Exhaust gas has been plagued by sewage paper industry, paper industry pollution problems of the country very seriously. Fujian Heng paper packaging company has been committed to the use of clean-type seller boiler 10 ton energy saving turkey paper processing. October 22, 2016, David Carse, the paper with my company, signed a 6 tons of steam an integral condensing steam boiler for the production of corrugated cardboard and other paper products. I provided the boiler greatly solve the problem of sewage wastewater Heng paper. After the boiler operation, both to meet local environmental requirements, but also reduce operating costs for the constant boiler paper products.