hot water boiler 26oil heating water boiler

Basics 1 boiler maintenance, gas-fired boiler during operation Note the following points: (1) does not allow pressurized combustion gas boiler or furnace smoke, easy to burn out because stoker hole cover. Not on the bottom of the water (2) Gas boiler ground surface to prevent moisture corrosion. 2, gas boiler run every 2-3 weeks, should be checked once. 3, gas boiler run every 3-6 months after the shutdown should conduct a comprehensive inspection. (1) on the inside and outside gas boiler inspection, such as pressure welds, corroded steel inside and outside part of the phenomenon, if found should be repaired in a serious flaw, if the defect is not serious next time also to be shutdown to repair, if found when there is suspicious, but does not affect safety, records should be made for future reference. (2) can be checked and the water boiler primer coating to prevent corrosion. 4, gas boilers and boiler base paint at least once a year. 5, maintenance of gas boiler normally unused methods: dry and wet two kinds, one month shutdown, care should be taken dry method, wet shutdown can be less than one month regimen. (1) Dry regimen: the boiler furnace shutdown to discharge water, the inside completely remove the dirt, rinse, drying in the furnace with Weihuo (be careful not to fire), and a diameter of 10-30 millimeters block quicklime installed sub-plate, placed in the drum, without contacting the metal with lime, quicklime weight, calculated to the drum 8 kilograms per cubic meter volume, and then all of the manhole, the pipe valve closed hand holes, each of three months, check again, such as lime ingredients like broken, i.e. the need to replace, should be re-run the boiler and the lime disk unloading. (2) Wet regimen: After Shutdown of the water discharge released, the internal completely remove the dirt, rinse, refill treated water to the full, the water was heated to 100 deg.] C oven, so that the water discharge gas outside of the furnace, then close all the valves, cold climates where moisture can not support the use of law, so as not to damage the boiler furnace water freezes.

Why should regularly boiler decoking and put ashes? All contain a certain amount of the solid fuel ash, coal-fired boiler combustion process fly ash and cinder there will be generated, cinder ash hopper falls cold fly ash particles may fall into a large economizer while passing through the tail, discharge hopper in an air preheater, and then you need to put the ash slag periodically, in order to avoid plugging and blocking ash residue. In addition to focus and put the ash is not timely, it will cause Heating Surface temperature rise, so that the heating surface coke heavy, causing steam temperature rise, damage the water cycle, increased exhaust loss, when coke is serious, it will result in boiler output decline. When severe fouling, can also block the tail channel, even forced shutdown for maintenance.

Fast boiler is a very trustworthy business, whether it is the beginning of cooperation or boiler put into operation, such as a party soon have maintained cooperative attitude, patience, careful. To ensure long-term stability of the latter part of the boiler operation, fast boiler technician fireman's gave us a free people to do the training, precautions and reduce the accident rate method full guidance boiler operation. --customer feedback

Generally it refers to a heating boiler hot water boiler 26heating water boilers, hot water boilers and pressure into two pressurized hot water boiler. The operating pressure is atmospheric pressure hot water boilers, boiler installation and use without inspection, it is not subject to supervisory inspection of the quality supervision department. But with pressure hot water boiler and the steam boiler as the boiler installation and daily use, are rigorously inspected and accepted, to be put into use after passing.