2ton natural gas steam boiler

Now we have many types 2ton steam boiler for chili sauce factory, there are gas fired steam boiler, oil fired steam boiler, coal fired steam boiler, biomass fired steam boiler, solid fuel steam boiler, straw steam boiler. The chili sauce plant can choose the suitable steam boiler according to the fuel cost in the local.

Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

Central heating hot water boilers for heating in winter is an important measure in most parts of China. Hebei Guan China Fortune Foundation Limited mainly engaged in real estate projects, is a leading industrial town operators. Heating service is primarily aimed at the Group's residential housing and other real estate. With the full open sky Battle, continue to improve the proportion of clean heating, heating for the implementation of clean energy, China Fortune Foundation to purchase much-needed high performance hot water boiler clean and green products. After comparing a number of boiler plants, the best of the best, determined to cooperate with the fast boiler in abundant clean energy R & D experience in boiler party. Providing fast boiler SZS Series 2 gas hot water boiler according to the actual needs, respectively 58MW and 29MW.

Accessories szs system and boiler water tube boilers which (1) the fuel system the fuel system of pumps pumping fuel from the fuel tank to the day tank, is then withdrawn from the daily tank fuel pump, through a pressurized, heated, and sprayed into the filter oil atomization. This system is usually divided into the border daily service tank and oil supply system and fuel system. (2) feedwater, condensate water, steam condensate system piping system comprising pipes and valves and piping and other equipment from the deaerator. Steam system comprises a steam pipe and various valves. (3) the ventilation system features a ventilation system external air into the furnace for combustion of fuel, and the products of combustion (flue gases) discharged from the boiler to the atmosphere. In the process of air and flue gas flow, there will be a variety of flow resistance, if the natural ventilation generated by a chimney to overcome the resistance to flow, called natural ventilation. Obviously, this ventilation air flow generated is small, can be improved by increasing the height of the chimney natural ventilation. Using a fan to overcome the flow resistance of various ventilation systems, called mechanical ventilation. Mechanical ventilation is divided into positive pressure ventilation, ventilation and negative balanced ventilation. The so-called positive pressure ventilation means for sending air to the boiler and the flue gas discharged from the boiler to the atmosphere. Primer furnace boiler flue gas exhaust blower suction chamber, known as negative pressure ventilation. (4) boiler auxiliaries and monitoring instrumentation and monitoring instrumentation, boiler accessories boiler safe and economic operation are necessary, including: (A) as an annex to ensure the safe operation of the boiler: water level gauge, safety valve, pressure gauge and thermometer indicating steam parameters ; B) combustion supervision parts: pressure gauge, carbon dioxide indicator, oxygen table, smoking view mirror.