Horizontal 10 bar 1 ton Oil Steam Boiler

Steam boiler pressure gauge should pay attention to matters 1, rated steam pressure less than 2.45MPa horizontal 10 bar 1 ton steam boiler and pressure gauge accuracy not only in 2.5; rated pressure steam boiler child or equal to 2.45MPa, the pressure is too spread made not less than 1.5 level. Dial gauge diameter of not less than 100mm, in order to ensure the operation of the operator to see the surface of the pressure value shown. 2, should draw the red line on the dial gauge steam boiler, he pointed out that the maximum allowable working pressure. 3, the steam boiler pressure gauge should be provided at a convenient place to observe and purging, and to prevent the high temperature affected, freezing and vibration. 4, steam boiler pressure gauge should check at least every six months once the check should seal. 5, the pressure gauge connection tube steam boiler should leaks steam leakage phenomenon, otherwise it will reduce the pressure instruction value. 6, a steam boiler gauge scale element should be compatible with the measured working pressure, working pressure, typically 1.5; 3 times, preferably 2 times. When no steam boiler gauges, pressure gauges or pressure damage did not meet the requirements of the apparatus, boiler steam pressure gauges of the following circumstances, should stop using: 1, the surface glass breaking or blurred dial scale; 2, no seals , damage or seal verification period exceeded; 3, no pressure gauge pointer finite bit staple staple can not be restored to the limit at infinite set of bits from zero gauge pressure exceeds the pressure data bits garment allowable difference?; 4, the jump table or a pointer leak; 5, other effects gauge accurate defect. The use of the accumulator: the accumulator for a hydraulic accumulator system intermittent mechanical, hydraulic fluid may be stored in the actuator output when a batch or a low speed, and the actuator requires a large flow of fast-moving, as an auxiliary energy providing oil to the system together with the hydraulic pump, oil pump and thereby achieve miniaturization of the entire hydraulic system, to achieve the object of absorbing the impact energy sudden change fast opening and closing valve and the hydraulic load, the system generates a pressure shock, pet cause vibrations and noise, and even damage the machine. The accumulator can be alleviated, which absorb fluid shock absorber pressure pulsation absorbing accumulator, and reducing the pressure pulsation and flow pulsations of various pump, thereby reducing system noise and vibration. Having a damping effect of the gas spring accumulator, it can be used to absorb the mechanical vibrations between the body and the traveling wheel of the vehicle and the like. The accumulator can be balanced upright actuator (hydraulic cylinder) and gravity load decreases when the potential absorption into hydraulic energy store, while generating the rate-limiting resistance; upright when the actuator rises, releasing the original absorbing energy accumulator , together with the pump oil to the hydraulic cylinder, in order to achieve balance and energy.

High resistance horizontal 10 bar 1 ton steam boiler gas handling system: 1, gas steam boiler pressure gauge, water level gauge, safety, sewage, a water supply valve, a steam valve, check whether the performance requirements, other valves in good condition. Gas hot water boiler with environmental protection, energy conservation, safety, salient features fully automatic operation, and ease of use. In addition, due to the operation of the economy, government policies to encourage, gas hot water boiler more and more people of all ages. Steam boiler is an energy conversion device, the energy input to the boiler fuel chemical energy, electrical energy, thermal energy and other forms of high temperature flue gas, and after converting the boiler, the steam output having a certain outside thermal energy, high-temperature hot water or an organic carrier. 2, the boiler Zidongkongzhi device system, comprising a flame detector, level, temperature detection, a variety of interlocks and alarm means, display control system performance states to meet the requirements. Biomass boiler categories: biomass boilers Horizontal, vertical biomass boilers. Biomass gas thermal oil heaters, biomass steam boiler, biomass hot water boiler, biomass oil furnace.

Gas introduced gas horizontal 10 bar 1 ton steam boiler steam boiler stop sign Profile: natural gas steam boiler is a steam boiler gas, natural gas steam boiler with natural gas as fuel, the combustion in the furnace heat put out by heating the pot water, and allowed to vaporized into steam energy conversion device. Water pan (drum) is continuously released from the combustion of a gaseous fuel energy to heat the furnace temperature is increased and produce steam under pressure. Since the boiling point of water increases with increased pressure, the pot is sealed, the expansion of water vapor generated inside the pressure limited thermodynamic formed, strictly speaking, the steam boiler is heated in water at constant pressure saturated steam drum regasification water formed, is widely used as an energy source. Protection device: (1) protect the boiler water a boiler water level gauge plate supporting one to two, should always be compared with each other, inconsistent findings indicate that shall be corrected immediately. Class water level should be flushed, to determine their true level. While the water level comes electrode rod can accurately capture level signal to an alarm or a pump control. (2) steam pressure protection pressure controller: selection of high sensitivity of the pressure controller, the pressure is high, or low levels of signal to the electrical switches, other control lines or automatic control chain protection. Using pressure controllers and electrical contacts, the vapor pressure can overpressure alarm; single adjustable pressure controller or dual fire burning fire the actual operating pressure. Safety valve: safety valve is the last line of defense to protect the boiler, the boiler pressure exceeds the limit, according to the set pressure relief valve design with the school, the exhaust steam pressure relief, to ensure the normal operation of the boiler. (3) having a burner flame protection flame protection inlet means, combustion function is to detect, when the ignition failure or extinguish combustion middle, immediately off the burner into the oil (gas) solenoid valve, the blower continues to operate at this time, the furnace was purged combustible residual gas, after 20 to 30 seconds purge, and various auxiliary blowers automatically cut off power, the boiler operation stops. (4) self-locking power failure protection case, the boiler shutdown immediately burst self-locking power interruption, if the current power is restored, the boiler will not start at any time, you must reset release self-locking, to re-start the ignition. Editing boiler ignition procedures: 1. Check operation and (or) shift recording. 2, inspection, examination boiler, external. 3, check the main safety accessories. Safety valve, water gauge, pressure gauge, to be tight, reliable and sensitive. 4, check the water treatment equipment. 5, inspection equipment and soda water supply system pipe. Adjust the valves as required to start. 6. Check the oil supply equipment. After the above inspection qualified, you can start the boiler. Note: The boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in government agencies, public companies and all walks of life, it is dangerous and special equipment. Event of an accident involving public safety, it will cause huge losses to the state and people's lives and property. For public safety, people's lives and property safety, according to the State Council, "Regulations on Safety Supervision of Special Equipment", the boiler should use full attention the following matters: 1, should be accompanied by safety technical specifications of the factory boiler design documents, product quality certification, safety and the use and maintenance instructions, supervision and inspection certificate (safety supervision, inspection and performance certificate). 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler.

Recently, the National Energy Board, the Department of Ecology Environment issued "on the issuance of 2018, the provinces (autonomous regions and municipalities) of coal ultra-low emissions and energy-saving targets and tasks" (the "Notice"), called on all localities continued to do over coal low-emission and energy-saving, and promote the development of clean and efficient coal. Ultra-low emissions and to promote energy-saving work in the country has been more than two years, has been established to complete the task of transformation in the eastern provinces, the transformation of the focus shifted to the central and western regions, while the transformation of scope as technology advances and the increasing demand for policy gradually extended.

Under the "notice" requirement, this year nationwide, ultra-low emissions coal power reform objectives and tasks a total of 48.68 million kilowatts, energy-saving goal is to reach 53.905 million kilowatts. In 2016, the capacity of the units involved in the transformation of two to 254.36 million kilowatts, respectively, and 189.4 million kilowatts, good reform bear fruit.

President of the State Power Environmental Protection Research Institute Zhu France and China, said: "By the end of last year, a nationwide ultra-low emissions transformation target task completion rate has reached 71%," ultra-low emissions coal and transformation better, the eastern region has been basically completed, part central provinces ahead of the completion of the task of transformation.

In 2015, the former Ministry of Environmental Protection, the National Development and Reform Commission, the National Energy Board issued "the full implementation of ultra-low emissions and energy-saving programs of work-fired power plant", requires the completion of the eastern part of the overall transformation of ultra-low emissions before the end of 2017, the central region and strive in 2018 years basically completed, the completion of the western region in 2020. "2018 provinces (autonomous regions and municipalities) of coal ultra-low emissions and energy-saving task summary table" (hereinafter referred to as "transformation task list") shows that the eastern provinces have been basically completed the transformation of ultra-low emissions, not published this year transformation capacity unit task. But it is located in the Yangtze River Delta, Jiangsu Province, still issued 1.4 million kilowatts ultra-low emissions and energy-saving renovation target of 900,000 kilowatts.

Zhu France and China, said, "in accordance with the requirements of 2015, Jiangsu has completed the ultra-low emissions and energy-saving target in 2017. However, the new policy will be more units into the transformation range, Jiangsu this year, there is still the task of transformation. In June, the State Council issued a "winning blue sky battle three-year action plan" (hereinafter referred to as "three-year action plan"), required by the end of 2020, more than 65 tons of steam key areas of coal-fired boilers have completed ultra-low emissions and energy-saving. "

It is understood that "three-year action plan" prior to the implementation of energy-saving and environmental protection requirements only for the reconstruction of more than 300,000 kilowatts of conventional units, more than 100,000 kilowatts of power plant owned units. "According to the existing requirements, including Beijing and Tianjin and the surrounding areas, the Yangtze River Delta region and Fenwei plains, including the key areas, more than 65 tons of steam boilers are also included in the scope of the transformation will involve part of 100,000 kilowatts or less captive power plant units and industrial boilers. "Zhu France and China, said," "three-year action plan" in addition to the deadline of 2020, does not provide a specific timetable for the task. Next, the key areas are the provinces in accordance with the requirements of more units, boiler transformation. "

"Task of transformation" table displays, ultra-low emissions transformation capacity this year, mainly in the western region of Inner Mongolia, Shaanxi, Gansu, Xinjiang and so on. In the trend of ultra-low emissions overall speed of the transformation, central Shanxi, Anhui, Henan and other provinces in the region have been completed ahead of the transformation target ultra-low emissions, but energy-saving task still more arduous. Among them, Henan Province this year, energy-saving target capacity of 10.8 million kilowatts, Hunan has reached 9.995 million kilowatts.

Since the ultra-low emission transformation involves the emission of pollutants and other environmental problems, caused by the high social concern. In contrast, concern about energy-saving electric power mainly from the enterprises themselves. Zhu France and China, told reporters, on the one hand is the national energy saving policy requirements, on the other hand also in line with the needs of enterprises to reduce their own costs. At present coal prices continued to run high, coal companies operating pressure, reduce production costs even more urgent demand.

In 2014, the National Development and Reform Commission, the former Ministry of Environmental Protection, the National Energy Board issued "coal upgrading and transformation of energy saving action plan (2014-2020 years)", for energy-saving technology roadmap active coal-fired power units were enumerated, involving the master each link auxiliary equipment, environmental protection equipment and a total of 20 reform measures, in addition to "subcritical unit transformed into ultra (ultra) supercritical units", the rest of the technology have already matured.

In recent years, along with tighter environmental requirements, provide renovation and operation and maintenance services to the rapid development of environmental protection industry. In particular third-party environmental companies, with technical, cost and other advantages, occupy a certain share of power generation enterprise environmental transformation market. But a power industry experts said, is very difficult third-party independent companies to enter the field of environmental protection energy-saving power plant.

"Ultra-low emission increase in the transformation of the original system is new equipment, energy-saving and optimized for major transformation of existing equipment, and boiler plant, steam turbine plant than environmental protection enterprises to understand their own devices." The expert said, "Not only that as systems engineering, energy-efficient coal-fired units involved in the whole process of production, and plant operation economy, is closely related to security, not easily open to third-party companies. third-party companies to enter the energy-saving environmental protection than to enter the market face greater pressure."