industrial gas fired water tube boiler

"Fangkuai" industrial fired water tube boiler relies on its own products and technical advantages in industrial boilers and automatic control, and uses advanced Internet of Things technology, mobile internet technology, cloud computing technology, big data technology and intelligent control technology with heat sources, heat networks, and thermal users. It is highly centralized to form an intelligent cloud management and control center, which truly realizes the intelligentization of industrial boilers. "Fangkuai" remote monitoring system for boilers has improved boiler operation efficiency; "Fangkuai" boiler cloud service platform allows boilers to learn to think; "Fangkuai" boiler big data allows boiler cloud service platform to have "super brain"; " The real-time monitoring of the “Fangkuai” boiler makes the boiler problem nowhere to hide; the “Fangkuai” boiler 400 service system makes the service more convenient and faster.

SZS series gas-fired superheated steam industrial fired water tube boiler project for heating industryXinzheng Heli Thermal Co., Ltd. is a company specializing in heat energy production and central heating supplying, providing heat source for winter heating for people in Xinzheng . Facing the increasingly serious environmental problems, Xinzheng Heli decided to respond positively to the "coal to gas" policy, using clean energy natural gas as boiler fuel and introducing high efficient gas-fired boilers to replace the original coal-fired boilers. For this, Xinzheng Heli Thermal carried out an open bidding. After competitive bidding and strict selection,ZOZEN defeated other competitors and won the bid with its comprehensive corporate strength. The winning bid was ZOZEN energy saving and environmental protection product - SZS series condensing gas-fired superheated steam boiler (3 sets of SZS75-1.6-Q). The furnace and the front and rear walls of this series of boilers adopt membrane water wall structure, and the airtightness is good. The large furnace design is combined with an advanced ultra-low NOx burner to ensure sufficient fuel combustion, controlling the NOx emissions below 30mg/m³ and the thermal efficiency up to 98%. At the same time, the boilers adopted the flue gas recirculation technology and were equipped with economizers and condensers at the tail of the boiler flue, which not only followed the concept of energy conservation and environmental protection, but also met the thermal energy requirements required by the project.

Dry: six gas-fired industrial fired water tube boiler safety procedures (hot water + steam) stage, the purchase of gas-fired boiler more and more users, in many industries, such as oil exploration, hospital disinfection, chemical production, wine feed, and so on. But many users initial contact with a gas boiler told us how to get started quickly boiler operation is not clear. First, all personnel must be familiar with the operation of the boiler boiler performance and safety knowledge, certificates; this non-job employees Never operate. Duty personnel should strictly follow the regulations, do a good job operating records and shift recording, the security situation should shift equipment and run tests, carried out. When the shift to check the boiler is intact. Second, purchasing, installing, or before the initial operation of the boiler, the boiler and safety accessories must conduct a comprehensive inspection, inspection and determined within the validity period to start. Third, Kai furnace ready to check the gas pressure is within the normal range of values, not too high or too low; check whether normal pump Sheung Shui, if unusual you need to open the purge valve until the Sheung Shui so far. Open the door of each section Water Supply System (including Sheung Shui before and after the festival gates pumps and boilers); check the water level, the water level should be in the normal position, the water level gauge, a water color need to plug in the open position, to prevent false water level, if missing water can be manually Sheung; check valves on the pressure pipe, must be opened, the wind deflector must all flue opening; each knob inspection control cabinet are in their normal position; steam boiler check valve is in the normally closed state, heat water boiler circulating pump outlet valve should be turned off; check water softening equipment is operating correctly, soft indicators of compliance with national standards. Fourth, Kai furnace run time 1, steam boilers Open the power to start the burner; check manholes, hand holes around the flange and valve leaks will be tightened, if there is still leakage after tightening occurs, you need to immediately stop maintenance furnace; l when the air pressure 0.05 ~ 0.1MPa, replenishment, sewage, water supply systems and sewage screening test device while flushing water table; when the pressure was raised to 0.1 ~ 0.15MPa, rinsed trap gauge; pressure was raised to 0.3 MPa, the "fire load / small fire" knob to "fire" to strengthen the combustion; 2/3 when the air pressure was raised to the operating pressure, start warming air supply tube, slowly open the main steam valve, to avoid water hammer; out when the drain valve when steam is completely close it; after all drain valve closed, slowly open the main valve to open, and then half a turn; "burner control" knob to "Auto"; level adjustment: adjusting the water level (according to the load manually when to start and stop the pump), low load level should be slightly higher than the normal level, high load level should be slightly lower than the normal level; steam pressure adjustment: adjusting the combustion load in accordance with (manual adjustment fire / small fire) determines combustion conditions The flame color, smoke color determination condition atomisation air quantity and exhaust gas temperature observed concentration chimney, the best change in the combustion temperature to be adjusted according to the combustion. 2, start the circulation pump hot water boiler; startup burner; 15 minutes after start, "" fire load / small fire "spin-bit color button to" fire ";." Burner control "knob to" Auto "five, normal stop 1 furnace, hot water boilers' fire load / small fire "knob to" small fire "; off the burner; close the fuel supply valve; closing dampers; boiler after the temperature dropped to 50 ℃, the pump outlet valve closing cycle ; .2 circulation pump is stopped, the position of the steam boiler "fire load / small fire"; Close combustor; steam pressure drop when the sewage to 0.05-0.1MPA; closing the main steam valve; manual replenishment to the higher level; Close valve; Close supply valve combustion; closed dampers; six off the main power, an emergency shutdown, the steam boiler main steam valve closed; off the main power; 2, boiler water boiler inlet and outlet valve closed; opening the emergency valve and the emergency discharge replenishment valve; off the main power switch; notification superiors.

With the rising price of gas and diesel, not to mention the wish for many to move towards a more sustainable fuel source, the option of solid fuel wood fire industrial fired water tube boilers is very attractive. Solid fuel fired boilers are offered in capacities up to 35 tons of steaming per hour, and up to 25 MW of hot water per hour. Solid fuel refers to various types of solid material that are used as fuel to produce energy and provide heating, usually released through combustion. Solid fuels include wood, charcoal, peat, coal, and pellets made from wood, corn, wheat, rye and other grains. Solid Fuels: Coal / Lignite / Rice Husk, Saw Dust / Wood Chips / Baggasse.