Filling Bottle Natural Gas Vacuum Tube Boiler

Recently, Nanchang, Jiangxi Province to fully implement the national environmental protection work conference and the province's environmental protection work conference, combined with the actual situation of the city, issued a "blue sky Nanchang win the Battle of three-year action plan (2018-2020 years)" (referred to as " plan"). "Plan" put forward a management plan for major air pollution problems.

As the relevant departments to actively promote the utilization of clean energy. The city gradually reduce the proportion of coal consumption, by 2020, coal accounted for the proportion of energy consumption dropped to below 65%; principles and has gradually increased the proportion of natural gas energy consumption, adhere to "the electric power should", "should air the gas" to promote natural gas work to build the pipeline, steadily "coal to gas" project.

2018, the main city of Nanchang to the new area, the main city area and open small blue through the open area to expand the range of city ban on burning areas. By the end of 2020, Nanchang County, Jinxian, Anyi required scoping combustion zone ban within the jurisdiction of, and informed consent of the uniform implementation of the municipal government.

"Plan" put forward in 2018, the main city of the new areas into the combustion zone ban, the main city through the open area and a small blue through the open area phasing out the 10 steam tons / hour and coal-fired boilers; 35 tons of steam launch built-up area / out of hours and coal-fired boilers. As of 2020, the city built basically out of the region 10 steam tons / hour and coal-fired boilers, coal-fired boilers within 10-35 tons of steam / hour range is substantially complete alternative clean energy sources, and no longer approve new 10-35 steam tons / hour of coal-fired boilers.

Hot water filling bottle vacuum tube boilers, electrical control box may not be water vapor or flammable gas and electrical control box may not be water or steam and flammable gas, shut the door 6,7 good cabinet in the boiler operation, when using the boiler, to ensure replenishment of water inside. Remove the monthly level sensor cleaning prevents the low water level sensor water level should not affect the normal operation of the boiler. 8, boiler stop a long running time, cut off the power, while the water in the boiler tubes put the net, to prevent frost damage, rusting. 9, through "Listen, smell, see, touch," do normal maintenance of the control box, such as abnormal phenomenon should immediately cut off the power timely maintenance. 10, periodically heating tube fastening nut and the screw connections on the flange, to prevent overheating of the oxidation loose, even burn line. 11, the scale on the heating tube is attached easily, especially in hard water, more fouling. If there is no electric water boiler softening equipment, it recommended every 30-40 days, heating pipe disassembly for scale removal process, if the heating treatment equipment should be disassembled for a descaling process tube 6 months. Replace the heating tubes should pay attention to the connection restoration, replacement of bad sealing gasket, good fastening screws on the flange, the fastening screws should be fastened symmetrically repeatedly tightened in order to avoid water leakage. 12, when not the usual boiler, cut off the power, the control box is opened, check all the electrical connections of the nut member, looseness should be tightened to prevent bad burning ignition wires and electrical devices. The body may have a dry boiler maintenance can have a wet maintenance. Letter user 2, boiler water quality should comply with GB1576-2001 "low-pressure boiler water quality," the. When required because of the use of forced overpressure, vacuum measures must be used so as not to exceed the specified pressure. 3,4,5,6, for safety reasons, the boiler must be grounded. Boiler room must be well ventilated to ensure that the boiler house and its surroundings must not be placed flammable and explosive materials. In order to prolong the service life of the boiler and the heating pipe, it is recommended to install on a silicon Regent softener inlet duct. 7, all of which run the boiler, the furnace body should always check furring scale, if the local labor offices should contact quality dosing station or pickling treatment, or because the user does not perform desmutting treatment furnace to cause local overheating causing cracking furnace, the consequences of the users themselves. 8, when the non-blocked drains installed.

Analysis of how the production side if the vacuum filling bottle vacuum tube boiler formal professional formal professional vacuum producers able to provide professional boiler to the public, targeted one-design, and can provide a more professional and authoritative vacuum boiler system plan to the public, can guarantee exact best standards in the industry, may have the most cost-effective high-performance, make sure you buy other financial burden does not exist, and the characteristics and safety of use, it can get the best authority standards.

Factors affecting filling bottle vacuum tube boiler efficiency indicators vacuum which specific? Of coal are carrying vivid motion to natural gas, the use of a vacuum boiler, greatly reduces the fouling of infection, while discharging nitrogen oxides and other hazardous gases obtained press. Power navigation key goal is to measure vacuum boiler, behind a discussion of a number of incentives under the influence of vacuum boiler power goals. Well, the following fast boiler company Xiaobian for everyone to share, with a look: